ZLP630 Platform Material Options for Facade Painting
ZLP630 Platform Material Options for Facade Painting is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp630, 630kg. These values should be confirmed against the final supplied configuration and destination power supply.

Steel Painted / Hot Galvanized / Aluminum ZLP630 Suspended Working Platform For Building Facade Painting
Electric window cleaning Suspended Working platform is mainly used in the following aspects:
1. exterior maintenance and cleaning of high-rise buildings ,
2.Construction inspection and maintenance of big-size tanks,chimneys ,dams, bridges and derricks.
3,welding, cleaning and painting of big-size ship.
Technical Data Sheet for ZLP630 suspended Platform:
| model | zlp630 |
| rated load | 630kg |
| No. of platform | 3 sections |
| lifting speed | 9.6 m/min |
| Size of platform | (2000 x 3) x 690 x 1300 mm |
| suspension mechanism | 2 x 175 kg |
| motor power | 2 x 1.5 kw |
| Voltage | 380V/220V/415V/440V,50HZ/60HZ,3 Phase |
| material | steel or aluminum |
| Counter Weight | 900kg;cement only; steel cover+cement; cast iron; |
Remarks:
1.SUCCESS can also manufacture ZLP250 , ZLP500 , ZLP800 , ZLP1000 suspended platform.
2.We also have OEM and ODM service.
3. Service hours:24 hours * 365 days.



Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our suspended working platform, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
