Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

ZLP800 čelična platforma za čišćenje spoljašnjeg zida
ZLP800 Čelična viseća platforma sastoji se od komponenti pomoću: dizalica, sigurnosnih brava, električnog upravljačkog sistema, platforme za suspenziju, mehanizama za suspenziju, kontra težine, čeličnog užeta i sl., I uglavnom se koristi za obnavljanje zidova, i čišćenje prozora.
1. Tehnički parametri
| Model | ZLP800 | |
| Dužina kabla / čelične žice | 100 metara | |
| Nazivno opterećenje | 800Kgs | |
| Brzina podizanja | 9.6M / Min | |
| Dimenzije platforme (L * W * H) | 7500MM * 690MM * 1300MM | |
| Prečnik čelične žice | 9.1MM | |
| Dizalica | Snaga | 2 * 1.8Kw |
| voltaža | 380V, 50Hz, 3 faze | |
| Sigurnosna brava | Maksimalna sila udarca | 30KN |
| Ugao zaključavanja kabla | 3º-8º | |
| Suspenzioni mehanizam | Prednji nosač | 1.3-1.7M |
| Podesiva visina | 1.44-2.14M | |
| Donji točak | 4 kom | |
| Kontrakt betona | 1000Kg | |
| Zidni točak ispod platforme | 4 kom | |
2 Crtanje proizvoda

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our platforma za čišćenje prozora, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.