Steel Three-phase ZLP800 Suspended Working Platform

Steel Three-phase ZLP800 Suspended Working Platform

Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

Ķīna-gondola-zlp630-karsti cinkota gondola (1)

ZLP800 tērauda piekares platforma ārsienas tīrīšanai


ZLP800 Tērauda piekarināmo platformu veido detaļas ar: pacēlājiem, drošības slēdžiem, elektriskās vadības sistēmu, piekares platformu, balstiekārtas mehānismu, pretsvaru, tērauda trošu utt., Un, galvenokārt tiek izmantotas ārējās sienas atjaunošanai, aizkaru sienu montāža un logu tīrīšana.

1. Tehniskie parametri

ModelisZLP800
Kabeļu / tērauda stiepļu troses garums100 metri
Nominālā slodze800 kg
Pacelšanas ātrums9,6 M / min
Platformas izmēri (L * W * H)7500MM * 690MM * 1300MM
Tērauda virves diametrs9,1 m
PacēlājsJauda2 * 1.8Kw
spriegums380V, 50Hz, 3 fāzes
Drošības atslēgaMaksimālais trieciena spēks30KN
Bloķēšanas kabeļa leņķis3º-8º
Piekares mehānismsPriekšējo lukturu pārsegs1.3-1.7M
Atbalsta regulējamu augstumu1,44-2,14M
Apakšējais ritenis4 gab
Betona pretsvaru1000 kg
Ratta ritenis zem platformas4 gab

2 produkta rasējums

Steel Three-phase ZLP800 Suspended Working Platform - image 2

Configuration and Applications

Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.

Project Information Required

  • Building height and required working length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Review our logu tīrīšanas platforma, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.