Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

Gondola-zlp630-hot-dip-galvanized-gondola (1)

Platform ZLP800 baja ditanggepi kanggo njaba tembok njaba


ZLP800 Steel Suspended Platform kasusun saka komponen dening: hoists, kunci safety, sistem kontrol listrik, platform suspend, mekanisme penundaan, bobot counter, tali baja, etc, lan, Iku utamané digunakake ing tembe mbangun metu, Instalasi tembok curtain lan jendhela reresik.

1. Parameter teknis

ModelZLP800
Panjang kabel / baja tali100 Meter
Ditrapake muatan800Kgs
Ngebut kacepetan9.6M / Min
Ukuran platform (L * W * H)7500MM * 690MM * 1300MM
Diameter tali baja9.1mm
AngkatDaya2 * 1.8Kw
Tegangan380V, 50HZ, 3 Fase
Kunci safetyDaya maksimal30KN
Ngunci kabel kabel3º-8º
Mekanisme penundaanNdhuwur garis beam1.3-1.7M
Ndhukung dhuwur dhuwur1.44-2.14M
Roda ngisor4 Pcs
Bobot kontra1000Kg
Caster wheel under platform4 Pcs

Gambar Produk

Steel Three-phase ZLP800 Suspended Working Platform - image 2

Configuration and Applications

Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.

Project Information Required

  • Building height and required working length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Review our jendhela reresik jendhela, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.