Mast Climbing and Mobile Elevated Work Platform
Mast Climbing and Mobile Elevated Work Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The final platform length, rated load, electrical supply and suspension arrangement should be confirmed for the actual project.

Mast climbing Suspended Work Platform / visoka radna platforma
opisi
Prijave:
1. Čišćenje i održavanje vanjskog zida visokogradnje.
2. Slikanje, ukrašavanje i obnavljanje vanjskih zidova.
3. Instalacijski projekti i ostale građevinske radnje vanjskih zidova visokogradnje.
4. Antenski rad broda, velika kula, most, brana i veliki dimnjaci.
5. Instalirajte i održavajte visokogradnja dizala za dizalo, brodogradnju, morska plovila, održavanje zavarivanja ratnih brodova.
Tehnički parametri
| Model nekretnine br. | ZLP500 | |
| Nazivna opterećenja (kg) | 500 | |
| Brzina podizanja (m / min) | 9-11 | |
| Snaga motora (kw) | 2 x 1.5 50 Hz / 60 Hz | |
| Zakretni moment kočnice (km) | 16 | |
| Područje podešavanja kutnog užeta (°) | 3 ° - 8 ° | |
| Udaljenost između dva čelična užeta (mm) | ≤100 | |
| Nazivna duljina prednjeg svjetla (mm) | 1500 | |
| Obustava platforme | Zaključavanje | Aluminijska legura |
| Broj postolja platforme | Pojedinačni stalak | |
| Broj platforme | 2 | |
| L × W × H (mm) | (2.500 × 2) × 690 × 1300 | |
| Težina (kg) | 375 kg | |
| Mehanizam suspenzije (kg) | 2 × 175 kg | |
| Protupopulacija (kg) po izboru | 25 × 30pcs | |
| Promjer čeličnog užeta (mm) | 8.3 | |
| Maks. Visina podizanja (m) | 300 | |
| Brzina vrtnje motora (r / min) | 1420 | |
| Napon (v) 3 FASADE / Jedna faza | 220V / 380V / 415V, 50 / 60Hz (Prilagođeno) | |
Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our obložena radna platforma, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.