ZLP500 Suspended Working Platform for Construction
ZLP500 Suspended Working Platform for Construction is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp500. These values should be confirmed against the final supplied configuration and destination power supply.

Descriptions:
aplikazioak:
1. Goi-mailako eraikinaren kanpoko horma garbitu eta mantentzea.
2. Kanpoaldeko hormako pintura, apainketa eta zaharberritzea.
3. Instalazio-proiektuak eta goi-mailako eraikinaren kanpoko hormak eraikitzeko beste eraikuntza batzuk.
4. Itsasontzia, dorrea, zubia, presak eta tximini handiak aireko lanean.
5. Instalatu eta mantendu goi-mailako eraikineko igogailu hoistway, itsasontzien industria, ontzi itsasontziz, ontzi soldadura mantentzeko.
zehaztapenak
| Jabetza Modeloaren zenbakia. | ZLP500 | |
| Karga nominala (kg) | 500 | |
| Igogailua abiadura (m / min) | 9 ~ 11 | |
| Motorearen potentzia (kw) | 2 × 1.5 50HZ / 60HZ | |
| Brake momentua (Km) | 16 | |
| Soka koroa angeluaren egokitze-tartea (°) | 3 ° - 8 ° | |
| Sokaren bi sokaren arteko distantzia (mm) | ≤100 | |
| Beheko tarte motaren arabera (mm) | 1500 | |
| Plataforma etetea | blokeatzea | Aluminiozko aleazioa |
| Nr. Plataforma plataforma | Banako rack | |
| Nr.Of plataforma | 2 | |
| L × W × H (mm) | (2000 × 2) × 690 × 1180 | |
| Pisua (kg) | 375 Kg | |
| Mekanismoa etetea (kg) | 2 × 175 Kg | |
| Counterweight (kg) aukerakoa | 25 × 30pcs | |
| Altzairu soken diametroa (mm) | 8.3 | |
| Gehienezko altuera altxatzea (m) | 300 | |
| Motorearen biraketa abiadura (r / min) | 1420 | |
| Tentsioa (v) 3FASES | 220V / 380V / 415V (Pertsonalizatuak) | |
Edukiontzien Enbalaketa:


Proiektuak:

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions