Steel Three-phase ZLP800 Suspended Working Platform

Steel Three-phase ZLP800 Suspended Working Platform

Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

Hiina-gondola-zlp630-kuumtsingitud gondliga (1)

ZLP800 terasest platvorm välisseina puhastamiseks


ZLP800 Terasest kinnitusplatvorm koosneb järgmistest komponentidest: tõstukid, turvavööd, elektriline juhtimissüsteem, piduripedaal, vedrustusmehhanism, vastukaal, terastross jne. Ja seda kasutatakse peamiselt seinte renoveerimiseks, kardinaseina paigaldamiseks ja aknapesu.

1. Tehnilised parameetrid

MudelZLP800
Kaabli / terastrossi pikkus100 meetrit
Nominaalne koormus800 kg
Tõstekiirus9,6 M / min
Platvormi mõõtmed (L * W * H)7500MM * 690MM * 1300MM
Terastrossi läbimõõt9,1 MM
TõstukVõimsus2 * 1.8Kw
Pinge380 V, 50 Hz, 3 faasi
OhutuslukkSuurim löögisurve30KN
Kaabli nurga lukustamine3º-8º
VedrustusmehhanismTagumine eesmine äär1.3-1.7M
Toetage reguleeritavat kõrgust1,44-2,14M
Alumine ratas4 tk
Betooni counter kaal1000Kg
Ratasaratas platvormi all4 tk

2 Toote joonis

Steel Three-phase ZLP800 Suspended Working Platform - image 2

Configuration and Applications

Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.

Project Information Required

  • Building height and required working length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Review our akna puhastusplatvorm, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.