Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

ZLP800钢制悬挂平台,用于外墙清洁
ZLP800钢制悬挂平台由以下部件组成:起重机,安全锁,电控系统,悬挂平台,悬挂机构,配重,钢丝绳等,主要用于外墙翻新,幕墙安装和窗户清洁。
1.技术参数
| 模型 | ZLP800 | |
| 电缆/钢丝绳长度 | 100米 | |
| 额定载荷 | 800Kgs | |
| 提升速度 | 9.6M /分钟 | |
| 平台尺寸(长*宽*高) | 7500MM * 690MM * 1300MM | |
| 钢丝绳直径 | 9.1毫米 | |
| 提升 | 功率 | 2 * 1.8KW |
| 电压 | 380V,50HZ,3相 | |
| 安全锁 | 最大冲击力 | 30KN |
| 锁定电缆角度 | 3°,8° | |
| 暂停机制 | 前梁悬垂 | 1.3-1.7M |
| 支持高度可调 | 1.44-2.14M | |
| 底轮 | 4件 | |
| 混凝土配重 | 千公斤 | |
| 平台下的脚轮 | 4件 | |
2产品图纸

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our 窗户清洁平台, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.