ZLP630 Rope Suspended Platform

ZLP630 Rope Suspended Platform

ZLP630 Rope Suspended Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp 630, ZLP630, 630 KG. These values should be confirmed against the final supplied configuration and destination power supply.

 

ZLP630 Rope Suspended Platform
详细的产品描述

暂时安装的绳索悬挂平台/摇篮/贡多拉/脚手架/摇摆舞台ZLP630
快速细节:
1.型号:ZLP630
2.品牌名称:SUCCESS
3.材质:钢/铝
外观:塑料喷涂/热镀锌
5.装载量:630 KG
6.提升高度:最大300 Mts
7.配重:混凝土,带钢盖的混凝土,铁
产品规格:

名称 

Technical parameter

 

模型

 

ZLP800

 

ZLP630

 

Rated load

 

800公斤

 

630公斤

 

Lifting speed

 

9-11m /分钟

 

1-11m /分钟

 

Platform Dimension L×W×H(mm)

 

7500×690×1450

 

6000×690×1450

 

Lifting Height

 

100 m

 

100 m

 

电缆

 

100 m

 

100 m

 

Steel rope

 

Ф9.1mm

 

Ф8.3mm

 

提升

 

功率

 

1.8KW * 2

 

1.5KW * 2

 

电压

 

440V / 50HZ

 

440V / 50HZ

 

Safety lock

 

Permission force of impact

 

30KN

 

30KN

 

Locking Cable Angle

 

3°〜8°

 

3°〜8°

 

悬挂

 

机制

 

Front beam overhang

 

1.3〜.1.5m

 

1.3〜.1.5m

 

Support adjustable height

 

1.44〜2.14米

 

1.44〜2.14米

 

配重

 

1000KG

 

1000KG

 

20’ft container

 

8 sets

 

9 sets

组件和项目:

ZLP630 Rope Suspended Platform - image 2

Configuration and Applications

Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.

Project Information Required

  • Building height and required working length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Review our 绳索悬挂平台, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.