L-shaped Suspended Working Platform for Facade Painting
L-shaped Suspended Working Platform for Facade Painting is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references ZLP630, ZLP800, ZLP1000. These values should be confirmed against the final supplied configuration and destination power supply.

钢烤漆/热镀锌/铝ZLP630 / ZLP800 / ZLP1000 L型壁挂式悬挂平台
标准装置:2个起重机,2个安全锁,1个电控箱,4个钢丝绳,1卷安全绳,1卷电缆,配重。
替代装置:靠墙滚轮,悬挂机构轮,切断负载,防摇摆装置,线材卷绕器,延长件,平台屋顶等。
| 物业型号 | ZLP630 | ZLP800 | ZLP1000 | |
| 额定载荷(kg) | 630 | 800 | 1000 | |
| 提升速度(m / min) | 9〜11 | 8〜10 | 8~10 | |
| 电机功率(kw) | 2×1.5 50HZ / 60HZ | 2×1.8 50HZ / 60HZ | 2×2.2 50HZ / 60HZ | |
| 制动扭矩(Km) | 16 | 16 | 16 | |
| 钢丝绳角度调节范围(°) | 3° - 8° | 3° - 8° | 3° - 8° | |
| 两根钢丝绳之间的距离(mm) | ≤100 | ≤100 | ≤100 | |
| 前梁额定伸长率(mm) | 1500 | 1500 | 1500 | |
| 暂停平台 | 锁定 | 铝合金 | 铝合金 | 铝合金 |
| Nr.Of平台机架 | 单机架 | 单机架 | 单机架 | |
| Nr.Of平台 | 3 | 3 | 3 | |
| L×W×H(毫米) | (2000×3)×690×1300 | (2500×3)×690×1300 | (2500×3)×690×1300 | |
| 重量(kg) | 375公斤 | 410公斤 | 455公斤 | |
| 悬挂机制(kg) | 2×175公斤 | 2×175公斤 | 2×175公斤 | |
| 配重(kg)可选 | 25×36颗 | 25×40PCS | 25×44pcs | |
| 钢丝绳直径(mm) | 8.3 | 8.6 / 9.1 | 8.6 / 9.1 | |
| 最大提升高度(m) | 300 | 300 | 300 | |
| 电机转速(r / min) | 1420 | 1420 | 1420 | |
| 电压(v)3PHASES | 220V / 380V / 415V | 220V / 380V / 415V | 220V / 380V / 415V | |


Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our 暂停工作平台, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
