Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

ZLP800 staal geskors platform vir die buitemuurse skoonmaak
ZLP800 Staalophangplatform bestaan uit die komponente deur: hysbakke, veiligheidslotte, elektriese beheerstelsel, opskortplatform, ophangmeganisme, teengewig, staal tou, ens. En dit word hoofsaaklik gebruik in die opknapping van muur, Installering van gordynmuur en venster skoonmaak.
1. Die tegniese parameters
| model | ZLP800 | |
| Kabel / Staal touwlengte | 100 meter | |
| Gegradeerde las | 800Kgs | |
| Hefspoed | 9.6M / Min | |
| Dimensies van die platform (L * W * H) | 7500MM * 690MM * 1300mm | |
| Staal tou deursnee | 9.1MM | |
| takel | krag | 2 * 1.8Kw |
| Spanning | 380V, 50Hz, 3 fases | |
| Veiligheidslot | Maksimum impak krag | 30KN |
| Vergrendeling van die kabelhoek | 3º-8º | |
| Opskortingsmeganisme | Voorste balk oorhang | 1.3-1.7M |
| Steun verstelbare hoogte | 1.44-2.14M | |
| Onderwiel | 4 stuks | |
| Beton teen gewig | 1000kg | |
| Caster wiel onder die platform | 4 stuks | |
2 Produk Tekening

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our venster skoonmaak platform, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
