Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

Tashqi devorni tozalash uchun ZLP800 po'latdan ishlangan platforma
ZLP800 Polietilen Korpusni tashkil etuvchi platforma: yuk ko'targichlari, xavfsizlik qulflari, elektrni nazorat qilish tizimi, to'xtatuvchi platforma, ishlab chiqarish mexanizmi, qarama-qarshi og'irlik, po'lat arqonlar va boshqalar bilan jihozlangan. Va, asosan, tashqi devorni ta'mirlashda, va derazalarni tozalash.
1. Texnik ko'rsatkichlar
| Model | ZLP800 | |
| Kabel / Chelik o'ralib uzunligi | 100 metr | |
| Nomlangan yuk | 800Kgs | |
| Olib tashlash tezligi | 9.6M / Min | |
| Platformaning o'lchamlari (L * W * H) | 7500MM * 690MM * 1300MM | |
| Chelik halqa diametri | 9.1MM | |
| Qavatga | Quvvat | 2 * 1.8Kw |
| Kuchlanish | 380V, 50HZ, 3 faza | |
| Xavfsizlik himoyasi | Maksimal zarba kuchi | 30KN |
| Bolalning burchagi qulflanadi | 3º-8º | |
| Ishlab chiqarish mexanizmi | Old chiziq bo'ylab | 1.3-1.7M |
| Qo'llab-quvvatlash balandligi balandligi | 1.44-2.14M | |
| Pastki g'ildirak | 4 dona | |
| Beton taymer og'irligi | 1000Kg | |
| Yumshoq g'ildirak platformasida | 4 dona | |
2 Mahsulot chizish

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our oyna tozalash platformasi, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.