L-shaped Suspended Working Platform for Facade Painting
L-shaped Suspended Working Platform for Facade Painting is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references ZLP630, ZLP800, ZLP1000. These values should be confirmed against the final supplied configuration and destination power supply.

鋼烤漆/熱鍍鋅/鋁ZLP630 / ZLP800 / ZLP1000 L型壁掛式懸掛平台
標準裝置:2個起重機,2個安全鎖,1個電控箱,4個鋼絲繩,1卷安全繩,1卷電纜,配重。
替代裝置:靠牆滾輪,懸挂機構輪,切斷負載,防搖擺裝置,線材捲繞器,延長件,平台屋頂等。
| 物業型號 | ZLP630 | ZLP800 | ZLP1000 | |
| 額定載荷(kg) | 630 | 800 | 1000 | |
| 提升速度(m / min) | 9〜11 | 8〜10 | 8~10 | |
| 電機功率(kw) | 2×1.5 50HZ / 60HZ | 2×1.8 50HZ / 60HZ | 2×2.2 50HZ / 60HZ | |
| 制動扭矩(Km) | 16 | 16 | 16 | |
| 鋼絲繩角度調節範圍(°) | 3° - 8° | 3° - 8° | 3° - 8° | |
| 兩根鋼絲繩之間的距離(mm) | ≤100 | ≤100 | ≤100 | |
| 前梁額定伸長率(mm) | 1500 | 1500 | 1500 | |
| 暫停平台 | 鎖定 | 鋁合金 | 鋁合金 | 鋁合金 |
| Nr.Of平台機架 | 單機架 | 單機架 | 單機架 | |
| Nr.Of平台 | 3 | 3 | 3 | |
| L×W×H(毫米) | (2000×3)×690×1300 | (2500×3)×690×1300 | (2500×3)×690×1300 | |
| 重量(kg) | 375公斤 | 410公斤 | 455公斤 | |
| 懸挂機制(kg) | 2×175公斤 | 2×175公斤 | 2×175公斤 | |
| 配重(kg)可選 | 25×36顆 | 25×40PCS | 25×44pcs | |
| 鋼絲繩直徑(mm) | 8.3 | 8.6 / 9.1 | 8.6 / 9.1 | |
| 最大提升高度(m) | 300 | 300 | 300 | |
| 電機轉速(r / min) | 1420 | 1420 | 1420 | |
| 電壓(v)3PHASES | 220V / 380V / 415V | 220V / 380V / 415V | 220V / 380V / 415V | |


Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our 暫停工作平台, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.