ZLP630 Rope Suspended Platform
ZLP630 Rope Suspended Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp 630, ZLP630, 630 KG. These values should be confirmed against the final supplied configuration and destination power supply.

Geçici Olarak Yüklü Halat Askıya Alınmış Platform / Kızak / Gondol / İskele / Salıncak Aşaması ZLP630
Hızlı Detay:
1. Model No .: ZLP630
2. Marka Adı: BAŞARI
3. Malzeme: Çelik / Alüminyum
4. Görünüm: Plastik Sprey Boyalı / Sıcak Galvanizli
5. Kapasite Yükleme: 630 KG
6. Kaldırma Yüksekliği: Maksimum 300 Mts
7. karşı ağırlık: beton, çelik kapaklı, demir
Özellikler:
| isim | Technical parameter | ||
| model | ZLP800 | ZLP630 | |
| Rated load | 800 kg | 630Kg | |
| Lifting speed | 9-11m / dakika | 1-11m / dakika | |
| Platform Dimension L×W×H(mm) | X 690 x 1450 7500 | × 690 × 1450 6000 | |
| Lifting Height | 100 m | 100 m | |
| Kablo | 100 m | 100 m | |
| Steel rope | Ф9.1mm | Ф8.3mm | |
| vinç | Güç | 1.8kW * 2 | 1.5KW * 2 |
| Voltaj | 440V / 50Hz | 440V / 50Hz | |
| Safety lock | Permission force of impact | 30KN | 30KN |
| Locking Cable Angle | 3 ° ~ 8 ° | 3 ° ~ 8 ° | |
| Süspansiyon
mekanizma | Front beam overhang | 1.3 ~ .1.5m | 1.3 ~ .1.5m |
| Support adjustable height | 1.44 ~ 2.14m | 1.44 ~ 2.14m | |
| Karşı ağırlık | 1000KG | 1000KG | |
| 20’ft container | 8 sets | 9 sets | |
Bileşenler ve Projeler:

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our halat askıya alınmış platform, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
