Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

ZLP800 stålupphängad plattform för rengöring av ytterväggar
ZLP800 Stålupphängningsplattform består av komponenterna av: hissar, säkerhetslås, elektriskt styrsystem, upphängningsplattform, upphängningsmekanism, motvikt, ståltråd, etc. Och det används huvudsakligen vid renovering av väggar, Installation av gardinvägg och fönsterrengöring.
1. De tekniska parametrarna
| Modell | ZLP800 | |
| Kabel / ståltrådslängd | 100 meter | |
| Nominell belastning | 800Kgs | |
| Lyfthastighet | 9,6 miljoner / Min | |
| Dimensioner på plattformen (L * W * H) | 7500MM * 690mm * 1300mm | |
| Ståltoppdiameter | 9,1 mm | |
| Hissa | Kraft | 2 * 1.8Kw |
| Spänning | 380V, 50 Hz, 3 faser | |
| Säkerhetslås | Maximal slagkraft | 30 kN |
| Låsning av kabelvinkeln | 3º-8º | |
| Upphängningsmekanism | Frontljusöverhängning | 1.3-1.7M |
| Stödjusterbar höjd | 1.44-2.14M | |
| Bottenhjulet | 4 st | |
| Betongvikt | 1000kg | |
| Casterhjul under plattformen | 4 st | |
2 Produktritning

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our fönsterrengöringsplattform, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
