{"id":273,"date":"2018-10-07T02:55:14","date_gmt":"2018-10-07T02:55:14","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=273"},"modified":"2026-06-23T01:53:45","modified_gmt":"2026-06-23T01:53:45","slug":"hog-sakerhet-rep-suspenderades-plattform-hissar-installation-plattform-zlp630-zlp800-zlp1000","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/sv\/high-safety-rope-suspended-platform-elevators-installation-platform-zlp630-zlp800-zlp1000.html","title":{"rendered":"ZLP630 ZLP800 ZLP1000 Rope Suspended Platform"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ZLP630 ZLP800 ZLP1000 Rope Suspended Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>ZLP630 ZLP800 ZLP1000 Rope Suspended Platform<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp630, zlp800, zlp1000. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Reng\u00f6ring och underh\u00e5ll av h\u00f6ghusets ytterv\u00e4gg.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. M\u00e5lning, dekoration och renovering av ytterv\u00e4ggar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Installationsprojekt och annan konstruktion av yttre v\u00e4ggar i h\u00f6ghus.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Flygarbete av fartyg, stort torn, bro, dammar och stora skorstenar.<br>\n5. Installera och underh\u00e5lla f\u00f6r h\u00f6ghushisshissar, skeppsbyggnadsindustri, segelb\u00e5t, krigsskeppsvetsning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Reng\u00f6ring och underh\u00e5ll av h\u00f6ghusets ytterv\u00e4gg.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. M\u00e5lning, dekoration och renovering av ytterv\u00e4ggar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Installationsprojekt och annan konstruktion av yttre v\u00e4ggar i h\u00f6ghus.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Flygarbete av fartyg, stort torn, bro, dammar och stora skorstenar.<br>\n5. Installera och underh\u00e5lla f\u00f6r h\u00f6ghushisshissar, skeppsbyggnadsindustri, segelb\u00e5t, krigsskeppsvetsning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image alignnone size-full wp-image-274\"><img loading=\"lazy\" decoding=\"async\" width=\"868\" height=\"866\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Painted-Wire-Rope-Suspended-Working.png\" alt=\"ZLP630 ZLP800 ZLP1000 Rope Suspended Platform\" class=\"wp-image-274\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Painted-Wire-Rope-Suspended-Working.png 868w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Painted-Wire-Rope-Suspended-Working-150x150.png 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Painted-Wire-Rope-Suspended-Working-300x300.png 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Painted-Wire-Rope-Suspended-Working-768x766.png 768w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Painted-Wire-Rope-Suspended-Working-50x50.png 50w\" sizes=\"auto, (max-width: 868px) 100vw, 868px\" \/><figcaption class=\"wp-element-caption\"><strong>Detaljerad produktbeskrivning<\/strong><br><p><strong>ZLP-serien ZLP500, ZLP630, ZLP800, ZLP1000 Rope-upph\u00e4ngd plattform f\u00f6r byggkonstruktion<\/strong><\/p><br><p><strong>Anv\u00e4ndningsomr\u00e5den:<\/strong> <br>1. Reng\u00f6ring och underh\u00e5ll av h\u00f6ghusets ytterv\u00e4gg.<br>2. M\u00e5lning, dekoration och renovering av ytterv\u00e4ggar.<br>3. Installationsprojekt och annan konstruktion av yttre v\u00e4ggar i h\u00f6ghus.<br>4. Flygarbete av fartyg, stort torn, bro, dammar och stora skorstenar.<br>5. Installera och underh\u00e5lla f\u00f6r h\u00f6ghushisshissar, skeppsbyggnadsindustri, segelb\u00e5t, krigsskeppsvetsning.<\/p><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Specifikationer:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Fastighetsmodell nr<\/td><td>ZLP500<\/td><td>ZLP630<\/td><td>ZLP800<\/td><td>ZLP1000<\/td><\/tr><tr><td colspan=\"2\">Nominell last (kg)<\/td><td>500<\/td><td>630<\/td><td>800<\/td><td>1000<\/td><\/tr><tr><td colspan=\"2\">Lyfthastighet (m \/ min)<\/td><td>9 ~ 11<\/td><td>9 ~ 11<\/td><td>8 ~ 10<\/td><td>8~10<\/td><\/tr><tr><td colspan=\"2\">Motoreffekt (kw)<\/td><td>2 \u00d7 1,5 50 Hz \/ 60 Hz<\/td><td>2 \u00d7 1,5 50 Hz \/ 60 Hz<\/td><td>2 \u00d7 1,8 50 Hz \/ 60 Hz<\/td><td>2 \u00d7 2,2<br>\n50HZ \/ 60HZ<\/td><\/tr><tr><td colspan=\"2\">Bromsmoment (Km)<\/td><td>16<\/td><td>16<\/td><td>16<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Inst\u00e4llningsomr\u00e5de f\u00f6r st\u00e5lvinkelvinkel (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><td>3 \u00b0 - 8 \u00b0<\/td><td>3 \u00b0 - 8 \u00b0<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Avst\u00e5nd mellan tv\u00e5 st\u00e5ltr\u00e5dar (mm)<\/td><td>\u2264100<\/td><td>\u2264100<\/td><td>\u2264100<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Nominell str\u00e4cka av fr\u00e4mre balk (mm)<\/td><td>1500<\/td><td>1500<\/td><td>1500<\/td><td>1500<\/td><\/tr><tr><td>Upph\u00e4ngningsplattform<\/td><td>l\u00e5sning<\/td><td>Aluminiumlegering<\/td><td>Aluminiumlegering<\/td><td>Aluminiumlegering<\/td><td>Aluminiumlegering<\/td><\/tr><tr><td><\/td><td>Nr.Of plattforms rack<\/td><td>Single rack<\/td><td>Single rack<\/td><td>Single rack<\/td><td>Single rack<\/td><\/tr><tr><td><\/td><td>Nr.Of plattform<\/td><td>2<\/td><td>3<\/td><td>3<\/td><td>3<\/td><\/tr><tr><td><\/td><td>L \u00d7 B \u00d7 H (mm)<\/td><td>(2000 x 2) x 690 x 1300<\/td><td>(2000 \u00d7 3) x 690 x 1300<\/td><td>(2500 \u00d7 3) x 690 x 1300<\/td><td>(2500 \u00d7 3) x 690 x 1300<\/td><\/tr><tr><td><\/td><td>Vikt (kg)<\/td><td>350 kg<\/td><td>375 kg<\/td><td>410 kg<\/td><td>455kg<\/td><\/tr><tr><td colspan=\"2\">Upph\u00e4ngningsmekanism (kg)<\/td><td>2 \u00d7 175 kg<\/td><td>2 \u00d7 175 kg<\/td><td>2 \u00d7 175 kg<\/td><td>2 \u00d7 175 kg<\/td><\/tr><tr><td colspan=\"2\">Motvikt (kg) valfritt<\/td><td>25 \u00d7 30st<\/td><td>25 \u00d7 36st<\/td><td>25 \u00d7 40pcs<\/td><td>25 \u00d7 44pcs<\/td><\/tr><tr><td colspan=\"2\">Diameter av st\u00e5ltr\u00e5d (mm)<\/td><td>8.3<\/td><td>8.3<\/td><td>8.6<\/td><td>8.6<\/td><\/tr><tr><td colspan=\"2\">Max Lyfth\u00f6jd (m)<\/td><td>300<\/td><td>300<\/td><td>300<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Motorrotationshastighet (r \/ min)<\/td><td>1420<\/td><td>1420<\/td><td>1420<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Sp\u00e4nning (v) 3PHASES<\/td><td>220V \/ 380V \/<br>\n415V<\/td><td>220V \/ 380V \/<br>\n415V<\/td><td>220V \/ 380V \/<br>\n415V<\/td><td>220V \/ 380V \/<br>\n415V<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>&nbsp;Konkurrensf\u00f6rdelar:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.Absol\u00e4rt garantera livs\u00e4kerheten under antennarbete<br>\nS\u00e4kerhetsl\u00e5s f\u00e4st st\u00e5ltr\u00e5den omedelbart n\u00e4r den sv\u00e4ngda plattformen sl\u00e4pper eller st\u00e5ltr\u00e5den glider ut ur hissen.<br>\nElektriskt styrsystem \u00e4r utformat med l\u00e4ckageskydd, \u00f6verhettningsskydd, str\u00f6m\u00f6verbelastningsskydd och bromsstopp.<br>\nH\u00f6gkvalitativt st\u00e5ltr\u00e5d, rep och kabel.<br>\n2. Stabil prestanda: Lyft upp och s\u00e4nk ner smidigt<br>\n3. Modul\u00e4r design. L\u00e4tt att demontera, montera drift och underh\u00e5ll.<br>\n4. Lyfth\u00f6jden kan justeras enligt krav (Max 300 meter)<br>\n5. Arbetssp\u00e4nning och frekvens kan justeras (220V \/ 380V \/ 415V etc.)<br>\n6. Suspended plattform f\u00f6r speciell anv\u00e4ndning kan anpassas (cirkul\u00e4r, L-form, U-form, etc.)<br>\n7. Professionell kvalitet, konkurrenskraftigt pris, snabb leverans, bra service.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Komponenter:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"567\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828145852_81102.jpg\" alt=\"ZLP630 ZLP800 ZLP1000 Rope Suspended Platform - image 2\" class=\"wp-image-275\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828145852_81102.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828145852_81102-300x284.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Containerf\u00f6rpackning:<\/strong><br>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-276\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828153158_10702.jpg\" alt=\"ZLP630 ZLP800 ZLP1000 Rope Suspended Platform - image 3\" width=\"600\" height=\"377\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828153158_10702.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828153158_10702-300x189.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-277\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828153223_34487.jpg\" alt=\"ZLP630 ZLP800 ZLP1000 Rope Suspended Platform - image 4\" width=\"600\" height=\"400\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828153223_34487.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20140828153223_34487-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/sv\/rep-suspenderades-plattform\/\">repplattform<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/sv\/kategori\/produkter\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/sv\/kontakta-oss\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>ZLP630 ZLP800 ZLP1000 Rope Suspended Platform. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":274,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,4],"tags":[13,10,15,17,19],"class_list":["post-273","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-rope-suspended-platform-manufacturer","tag-rope-suspended-platform-safety","tag-suspended-platform-hoist","tag-temporary-suspended-platform","tag-zlp-630-suspended-platform","tag-zlp-800-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/posts\/273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/comments?post=273"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/posts\/273\/revisions"}],"predecessor-version":[{"id":1408,"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/posts\/273\/revisions\/1408"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/media\/274"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/media?parent=273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/categories?post=273"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/sv\/wp-json\/wp\/v2\/tags?post=273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}