Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

ZLP800 jeklena viseča platforma za čiščenje zunanje stene
ZLP800 jeklena vzmetena ploščad sestoji iz sestavnih delov: dvigal, varnostnih ključavnic, električnega upravljalnega sistema, platforme za vzmetenje, mehanizma za vzmetenje, protiuteži, jeklene vrvi itd., In se večinoma uporablja pri obnovi stene, in čiščenje oken.
1. Tehnični parametri
| Model | ZLP800 | |
| Dolžina kabelske / jeklene vrvi | 100 metrov | |
| Nazivna obremenitev | 800Kgs | |
| Hitrost dvigovanja | 9,6M / Min | |
| Mere perona (L * W * H) | 7500MM * 690MM * 1300MM | |
| Premer jeklenega vrvi | 9.1MM | |
| Dvigalo | Moč | 2 * 1.8Kw |
| Napetost | 380V, 50Hz, 3 faze | |
| Varnostna ključavnica | Največja udarna sila | 30KN |
| Kot zaklepanja kabla | 3º-8º | |
| Mehanizem vzmetenja | Sprednji svetlobni pramen | 1.3-1.7M |
| Podpira nastavljivo višino | 1,44-2,14M | |
| Spodnje kolo | 4 kos | |
| Betonski kontrakt | 1000Kg | |
| Caster koles pod platformo | 4 kos | |
2 Risba izdelka

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our platforma za čiščenje oken, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.