{"id":225,"date":"2018-09-29T08:03:48","date_gmt":"2018-09-29T08:03:48","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=225"},"modified":"2026-06-23T01:53:56","modified_gmt":"2026-06-23T01:53:56","slug":"stoziar-lezenie-odpruzene-pracovna-plosina-mobile-zvysenej-prace-plosina","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/sk\/mast-climbing-suspended-working-platform-mobile-elevated-work-platform.html","title":{"rendered":"Mast Climbing and Mobile Elevated Work Platform"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Mast Climbing and Mobile Elevated Work Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Mast Climbing and Mobile Elevated Work Platform<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The final platform length, rated load, electrical supply and suspension arrangement should be confirmed for the actual project.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"700\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform.jpg\" alt=\"Zdv\u00edhacia pracovn\u00e1 plo\u0161ina na zdv\u00edhanie sto\u017eiarov \/ mobiln\u00e1 vyv\u00fd\u0161en\u00e1 pracovn\u00e1 plo\u0161ina\" class=\"wp-image-226\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform.jpg 700w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform-150x150.jpg 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform-300x300.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform-50x50.jpg 50w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Zdv\u00edhacia pracovn\u00e1 plo\u0161ina na zdv\u00edhanie sto\u017eiarov \/ mobiln\u00e1 vyv\u00fd\u0161en\u00e1 pracovn\u00e1 plo\u0161ina<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">popisy<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">aplik\u00e1cia:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. \u010cistenie a \u00fadr\u017eba vonkaj\u0161ej steny v\u00fd\u0161kov\u00fdch budov.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Ma\u013eovanie, dekor\u00e1cia a obnova vonkaj\u0161\u00edch stien.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. In\u0161tala\u010dn\u00e9 projekty a in\u00e9 stavebn\u00e9 pr\u00e1ce na vonkaj\u0161\u00edch sten\u00e1ch v\u00fd\u0161kov\u00fdch budov.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Leteck\u00e1 pr\u00e1ca na lodi, ve\u013ek\u00e1 ve\u017ea, most, priehrady a ve\u013ek\u00e9 kom\u00edny.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. In\u0161talova\u0165 a udr\u017eiava\u0165 pre v\u00fd\u0161kov\u00e9 budovy v\u00fd\u0165ah zdvih\u00e1k, lodiarstvo priemyslu, n\u00e1morn\u00e9 plavidlo, vojnov\u00e9 lode zv\u00e1ranie udr\u017eiava\u0165.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Technick\u00e9 parametre<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Model nehnute\u013enosti \u010d.<\/td><td>ZLP500<\/td><\/tr><tr><td colspan=\"2\">Menovit\u00e9 za\u0165a\u017eenie (kg)<\/td><td>500<\/td><\/tr><tr><td colspan=\"2\">R\u00fdchlos\u0165 zdv\u00edhania (m \/ min)<\/td><td>9 ~ 11<\/td><\/tr><tr><td colspan=\"2\">V\u00fdkon motora (kw)<\/td><td>2 \u00d7 1,5 50 Hz \/ 60 Hz<\/td><\/tr><tr><td colspan=\"2\">Brzdn\u00fd moment (Km)<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Rozsah nastavenia uhla oce\u013eov\u00e9ho lana (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Vzdialenos\u0165 medzi dvomi oce\u013eov\u00fdmi lanomi (mm)<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Menovit\u00fd rozmer predn\u00e9ho nosn\u00edka (mm)<\/td><td>1500<\/td><\/tr><tr><td rowspan=\"5\">Pozastavenie platformy<\/td><td>zamykanie<\/td><td>Hlin\u00edkov\u00e1 zliatina<\/td><\/tr><tr><td>\u010c<\/td><td>Jedin\u00fd stojan<\/td><\/tr><tr><td>Nr.Of platforma<\/td><td>2<\/td><\/tr><tr><td>L x W x H (mm)<\/td><td>(2500 x 2) x 690 \u00d7 1300<\/td><\/tr><tr><td>Hmotnos\u0165 (kg)<\/td><td>375 kg<\/td><\/tr><tr><td colspan=\"2\">Z\u00e1vesn\u00fd mechanizmus (kg)<\/td><td>2 \u00d7 175 kg<\/td><\/tr><tr><td colspan=\"2\">Protiv\u00e1ha (kg) je volite\u013en\u00e1<\/td><td>25 \u00d7 30 ks<\/td><\/tr><tr><td colspan=\"2\">Priemer oce\u013eov\u00e9ho lana (mm)<\/td><td>8.3<\/td><\/tr><tr><td colspan=\"2\">Max V\u00fd\u0161ka zdvihu (m)<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Ot\u00e1\u010dky motora (r \/ min)<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Nap\u00e4tie (v) 3-f\u00e1zov\u00e9 \/ jednof\u00e1zov\u00e9<\/td><td>220V \/ 380V \/ 415V, 50\/60 Hz<p><\/p>\n<p>(Na mieru)<\/p><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/sk\/suspendovaneho-pracovna-plosina\/\">pozastaven\u00e1 pracovn\u00e1 plo\u0161ina<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/sk\/kategorii\/produkty\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/sk\/kontaktuj-nas\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Mast Climbing and Mobile Elevated Work Platform. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":226,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,3],"tags":[10,14,15],"class_list":["post-225","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-suspended-working-platform-manufacturer","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-temporary-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/posts\/225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/comments?post=225"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/posts\/225\/revisions"}],"predecessor-version":[{"id":1418,"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/posts\/225\/revisions\/1418"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/media\/226"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/media?parent=225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/categories?post=225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/sk\/wp-json\/wp\/v2\/tags?post=225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}