{"id":762,"date":"2018-10-16T09:02:17","date_gmt":"2018-10-16T09:02:17","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=762"},"modified":"2026-06-23T01:52:03","modified_gmt":"2026-06-23T01:52:03","slug":"de-inalta-rezistenta-a-suspendat-lucru-platforma-u-banda","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/ro\/high-strength-suspended-working-platform-u-tape.html","title":{"rendered":"High-Strength Suspended Working Platform with U-Type Frame"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">High-Strength Suspended Working Platform with U-Type Frame<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>High-Strength Suspended Working Platform with U-Type Frame<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references ZLP-1000, ZLP-800, ZLP-800A, ZLP-630, ZLP-500, ZLP-250, 6m, 7.5m. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"757\" height=\"711\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/High-Strength-Suspended-Working-Platform-with-U-Tape-1.jpg\" alt=\"High-Strength Suspended Working Platform with U-Type Frame\" class=\"wp-image-764\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/High-Strength-Suspended-Working-Platform-with-U-Tape-1.jpg 757w, https:\/\/www.sewbc.com\/wp-content\/uploads\/High-Strength-Suspended-Working-Platform-with-U-Tape-1-300x282.jpg 300w\" sizes=\"auto, (max-width: 757px) 100vw, 757px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Informatii de baza<\/strong><br>\nSarcin\u0103 nominal\u0103 (Kg): 630,800,1000<br>\nLungimea platformei de lucru: 6m, 7,5m, 7,5m<br>\nMarc\u0103 comercial\u0103: marc\u0103 renumit\u0103 \u00een China<br>\nPachetul de transport: cutie de carton<br>\nSpecifica\u021bie: ISO9001: 2000<br>\nOrigine: Shanghai<br>\nCodul SA: 84289090<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>descrierea produsului<\/strong><\/p>\n\n\n\n<div class=\"rich-text-table\">\n<table border=\"1\">\n<tbody>\n<tr>\n<th>Pentru \u00eentreaga ma\u0219in\u0103<\/th>\n<\/tr>\n<tr>\n<th>SPECIFICA\u021aIE<\/th>\n<th>ZLP-1000<\/th>\n<th>ZLP-800<\/th>\n<th>ZLP-800A<\/th>\n<th>ZLP-630<\/th>\n<th>ZLP-500<\/th>\n<th>ZLP-250<\/th>\n<\/tr>\n<\/tbody>\n<tbody>\n<tr>\n<td>Programa\u021bi Greutate<br>\n(Kg)<\/td>\n<td>1000<\/td>\n<td>800<\/td>\n<td>800<\/td>\n<td>630<\/td>\n<td>500<\/td>\n<td>250<\/td>\n<\/tr>\n<tr>\n<td>Viteza de ridicare<br>\n(M \/ min)<\/td>\n<td>8-10<\/td>\n<td>8-11<\/td>\n<td>8-11<\/td>\n<td>9-11<\/td>\n<td>9-11<\/td>\n<td>8-11<\/td>\n<\/tr>\n<tr>\n<td>Putere nominal\u0103 (kw)<\/td>\n<td>3<\/td>\n<td>2.2<\/td>\n<td>1.8<\/td>\n<td>1.5<\/td>\n<td>1.5<\/td>\n<td>1.1<\/td>\n<\/tr>\n<tr>\n<td>Ridicare<\/td>\n<td>LTD100<\/td>\n<td>LTD80<\/td>\n<td>LTD80A<\/td>\n<td>LTD63<\/td>\n<td>LTD50<\/td>\n<td>LTD40<\/td>\n<\/tr>\n<tr>\n<td>\u00cencuietoare de siguran\u021b\u0103<\/td>\n<td>LSF308<\/td>\n<td>LSF308<\/td>\n<td>LSF309<\/td>\n<td>LSF308<\/td>\n<td>LSF308<\/td>\n<td>LSL20<\/td>\n<\/tr>\n<tr>\n<td>Dispozitivul suspendat<br>\nGreutate (Kg)<\/td>\n<td>350<\/td>\n<td>350<\/td>\n<td>350<\/td>\n<td>350<\/td>\n<td>350<\/td>\n<td>175<\/td>\n<\/tr>\n<tr>\n<td>Dimensiunile platformei de lucru (mm)<br>\nL x W * H<\/td>\n<td>(2500 x 3)<br>\nx760x1120<\/td>\n<td>(2500 x 3)<br>\nx760x1120<\/td>\n<td>(2500 x 3)<br>\nx760x1120<\/td>\n<td>(2000 \u00d7 3)<br>\nx760x1120<\/td>\n<td>(2500 x 2)<br>\nx760x1120<\/td>\n<td>1200<br>\nx650x2300<\/td>\n<\/tr>\n<tr>\n<td>Greutatea piesei de ridicare<br>\n(Kg)<\/td>\n<td>610 (o\u021bel)<br>\n480 (Alu)<\/td>\n<td>580 (o\u021bel)<br>\n450 (Alu)<\/td>\n<td>535 (o\u021bel)<br>\n380 (Al)<\/td>\n<td>480 (o\u021bel)<br>\n340 (Al)<\/td>\n<td>410 (o\u021bel)<br>\n290 (Al)<\/td>\n<td>200 (o\u021bel)<br>\n140 (Al)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<div class=\"rich-text-table\">\n<table border=\"1\">\n<tbody>\n<tr>\n<th>Pentru ridicare<\/th>\n<\/tr>\n<tr>\n<th>Tip<\/th>\n<th>LTD100<\/th>\n<th>LTD80<\/th>\n<th>LTD80A<\/th>\n<th>LTD63<\/th>\n<th>LTD50<\/th>\n<\/tr>\n<\/tbody>\n<tbody>\n<tr>\n<td>For\u021ba de ridicare nominal\u0103 (kN)<\/td>\n<td>10<\/td>\n<td>8<\/td>\n<td>8<\/td>\n<td>6.3<\/td>\n<td>5<\/td>\n<\/tr>\n<tr>\n<td>Viteza nominal\u0103 de ridicare (m \/ min)<\/td>\n<td>9<\/td>\n<td>9<\/td>\n<td>9<\/td>\n<td>9<\/td>\n<td>9.6<\/td>\n<\/tr>\n<tr>\n<td>Diametrul cablului<\/td>\n<td>8.3<\/td>\n<td>8.3<\/td>\n<td>9.1<\/td>\n<td>8.3<\/td>\n<td>8.3<\/td>\n<\/tr>\n<tr>\n<td>Greutate (kg)<\/td>\n<td>105<\/td>\n<td>95<\/td>\n<td>53<\/td>\n<td>52<\/td>\n<td>50<\/td>\n<\/tr>\n<tr>\n<td>Dimensiunea general\u0103<\/td>\n<td>700x370x320<\/td>\n<td>690x370x320<\/td>\n<td>595x296x225<\/td>\n<td>595x296x225<\/td>\n<td>585x296x225<\/td>\n<\/tr>\n<tr>\n<td>Tensiune AC (V)<\/td>\n<td>380<\/td>\n<td>380<\/td>\n<td>380<\/td>\n<td>380<\/td>\n<td>380<\/td>\n<\/tr>\n<tr>\n<td>Frecven\u021b\u0103 (Hz)<\/td>\n<td>50<\/td>\n<td>50<\/td>\n<td>50<\/td>\n<td>50<\/td>\n<td>50<\/td>\n<\/tr>\n<tr>\n<td>Putere (kW)<\/td>\n<td>3.0<\/td>\n<td>2.2<\/td>\n<td>1.8<\/td>\n<td>1.5<\/td>\n<td>1.1<\/td>\n<\/tr>\n<tr>\n<td>Moment de fr\u00e2nare (Nm)<\/td>\n<td>15<\/td>\n<td>15<\/td>\n<td>15<\/td>\n<td>15<\/td>\n<td>15<\/td>\n<\/tr>\n<tr>\n<td>Viteza de rota\u021bie (r \/ min)<\/td>\n<td>1420<\/td>\n<td>1420<\/td>\n<td>1400<\/td>\n<td>1400<\/td>\n<td>1400<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<div class=\"rich-text-table\">\n<table border=\"1\">\n<tbody>\n<tr>\n<th>Pentru blocarea de siguran\u021b\u0103<\/th>\n<\/tr>\n<tr>\n<th>Tip<\/th>\n<th>LSL<\/th>\n<th>LSF<\/th>\n<th>LSF<\/th>\n<\/tr>\n<\/tbody>\n<tbody>\n<tr>\n<td>configura\u021bie<\/td>\n<td>Centrifugal<\/td>\n<td>Anti-basculare<\/td>\n<td>Anti-basculare<\/td>\n<\/tr>\n<tr>\n<td>Diametrul cablului<\/td>\n<td>8.3mm<\/td>\n<td>8.3mm<\/td>\n<td>9.1mm<\/td>\n<\/tr>\n<tr>\n<td>For\u021ba de impact permis\u0103<\/td>\n<td>20 kN<\/td>\n<td>30kN<\/td>\n<td>30kN<\/td>\n<\/tr>\n<tr>\n<td>Distan\u021ba de blocare \u00een caz de rupere a cabinei<\/td>\n<td>&lt;200mm<\/td>\n<td>&lt;200mm<\/td>\n<td>&lt;200mm<\/td>\n<\/tr>\n<tr>\n<td>Unghiul de blocare a cablurilor<\/td>\n<td>3-8degree<\/td>\n<td>3-8degree<\/td>\n<td>3-8degree<\/td>\n<\/tr>\n<tr>\n<td>Viteza de blocare a cablului<\/td>\n<td>15-30m \/ min<\/td>\n<td>15-30m \/ min<\/td>\n<td>15-30m \/ min<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Platforma suspendat\u0103 este din ce \u00een ce mai acceptat\u0103 \u00een multe domenii \u00een loc de schele, cum ar fi cur\u0103\u021barea \u00eenalt\u0103, instalarea de sticl\u0103 de perete cortin\u0103, \u00eentre\u021binerea cl\u0103dirii, vopsirea \u0219i renun\u021barea.<\/p>\n<p>Siguran\u021ba este cea mai important\u0103 ca via\u021b\u0103 pentru cei mai pre\u021bio\u0219i din lume. A\u0219a c\u0103 toate eforturile noastre sunt de a asigura acest lucru. \u0218i noi am f\u0103cut-o.<\/p>\n<p>1.The quality is reliable because the factory has the ability of manufacture suspended platforms authorized by China Construction Machinery Industry Association. It&#8217;s not easy to get this certification and not all the factories can getting this authorizing.<\/p>\n<p>\u0218i suntem liderul acestui domeniu de platform\u0103 suspendat\u0103. Dac\u0103 ne trimite\u021bi un e-mail, v\u0103 putem trimite mai multe detalii.<br>\nAtelierul mare \u0219i experien\u021ba de peste 20 de ani asigur\u0103 calitatea noastr\u0103.<\/p>\n<p><strong>Cu noul design pentru ma\u0219in\u0103 de inspec\u021bie, toate componentele cheie ale dispozitivului de blocare \u0219i a dispozitivului de ridicare sunt verificate \u00eenainte de fabrica. Astfel platforma noastr\u0103 suspendat\u0103<\/strong><\/p>\n<p>poate asigura siguran\u021ba muncitorilor aerieni.<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/ro\/suspendat-platforma-de-lucru\/\">suspendat\u0103 platforma de lucru<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/ro\/categorie\/produse\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/ro\/contacteaza-ne\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>High-Strength Suspended Working Platform with U-Type Frame. Review specifications, applications, configuration options and project information required before<\/p>","protected":false},"author":1,"featured_media":763,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[10,14,12,15],"class_list":["post-762","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspended-working-platform-manufacturer","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-suspended-working-platform-safety","tag-temporary-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/posts\/762","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/comments?post=762"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/posts\/762\/revisions"}],"predecessor-version":[{"id":1322,"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/posts\/762\/revisions\/1322"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/media\/763"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/media?parent=762"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/categories?post=762"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/ro\/wp-json\/wp\/v2\/tags?post=762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}