Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

ZLP800 stalen hangbrug voor reiniging van de buitenmuur
ZLP800 staal geschorst platform bestaat uit de componenten door: takels, veiligheidssloten, elektrisch controlesysteem, hangplatform, ophangmechanisme, contragewicht, staalkabel, enz., En, wordt het hoofdzakelijk gebruikt in het opknappen van uit muur, Installatie van vliesgevel en glazenwassen.
1. De technische parameters
| Model | ZLP800 | |
| Lengte kabel / staaldraad | 100 meter | |
| Nominale belasting | 800Kgs | |
| Hijs snelheid | 9.6M / Min | |
| Afmetingen van platform (L * W * H) | 7500mm * 690mm * 1300mm | |
| Staaldraad diameter | 9,1 mm | |
| Hijsen | macht | 2 * 1.8Kw |
| Spanning | 380V, 50Hz, 3 fasen | |
| Veiligheidsslot | Maximale slagkracht | 30KN |
| Vergrendel de kabelhoek | 3º-8º | |
| Opschortingsmechanisme | Voorbalk overhang | 1.3-1.7M |
| Ondersteuning in hoogte verstelbaar | 1.44-2.14M | |
| Onderwiel | 4 stuks | |
| Concreet tegengewicht | 1000kg | |
| Zwenkwiel onder platform | 4 stuks | |
2 Producttekening

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our vensterreinigingsplatform, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
