Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

Platform keluli ZLP800 yang digantung untuk pembersihan dinding luar
Platform ZLP800 Steel Suspended terdiri daripada komponen-komponen oleh: angkat, kunci keselamatan, sistem kawalan elektrik, penggantungan platform, mekanisme penggantungan, berat kontra, tali keluli, dan sebagainya, Dan, Ia digunakan terutamanya dalam membaikpulihkan dinding, Pemasangan dinding tirai dan pembersihan tingkap.
1. Parameter teknikal
| Model | ZLP800 | |
| Panjang dawai kabel / keluli | 100 Meter | |
| Beban undian | 800Kgs | |
| Kelajuan mengangkat | 9.6M / Min | |
| Dimensi platform (L * W * H) | 7500MM * 690MM * 1300MM | |
| Diameter tali keluli | 9.1mm | |
| Hoist | Kuasa | 2 * 1.8Kw |
| voltan | 380V, 50HZ, 3 Fasa | |
| Kunci keselamatan | Daya impak maksima | 30KN |
| Mengunci sudut kabel | 3º-8º | |
| Mekanisme penggantungan | Rasuk depan tidak terjual | 1.3-1.7M |
| Sokongan ketinggian boleh laras | 1.44-2.14M | |
| Roda bawah | 4 Keping | |
| Berat kontra konkrit | 1000Kg | |
| Roda caster di bawah platform | 4 Keping | |
2 Lukisan Produk

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our platform pembersihan tingkap, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
