Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

ZLP800 plieninė pakabinama platforma išoriniam sienų valymui
ZLP800 plienine pakabinta platforma susideda iš: keltuvų, saugos spynų, elektrinės valdymo sistemos, pakabos platformos, pakabos mechanizmo, priešsvorio, plieninės lynų ir kt., Ir, daugiausia naudojama pertvarkant iš sienos, montavimas užuolaidų sienos ir langų valymas.
1. Techniniai parametrai
| Modelis | ZLP800 | |
| Kabelio / plieno vielos lynų ilgis | 100 metrų | |
| Nominali apkrova | 800 kg | |
| Kėlimo greitis | 9,6 M / min | |
| Platformos matmenys (L * W * H) | 7500MM * 690MM * 1300MM | |
| Plieno lynų skersmuo | 9,1 mln | |
| Keltuvas | Galia | 2 * 1.8Kw |
| Įtampa | 380V, 50Hz, 3 fazės | |
| Saugos užraktas | Maksimali smūgio jėga | 30KN |
| Užrakinimo kabelio kampas | 3º-8º | |
| Pakabos mechanizmas | Priekinis spindulys iškyla | 1.3-1.7M |
| Palaikomas reguliuojamas aukštis | 1.44-2.14M | |
| Apatinis ratas | 4 vnt | |
| Betono atskaitos svoris | 1000 kg | |
| Ratuko ratas po platforma | 4 vnt | |
2 produkto brėžinys

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our langų valymo platforma, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.