Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

ZLP800 ແທ່ນແຜ່ນເຫຼັກສໍາລັບການທໍາຄວາມສະອາດກໍາແພງຫີນນອກ
ZLP800 Steel Platform ປະກອບດ້ວຍຜະລິດຕະພັນໂດຍ: hoists, locks ຄວາມປອດໄພ, ລະບົບການຄວບຄຸມໄຟຟ້າ, ເວທີ suspension, ກົນຈັກ suspension, weight counter, ເຊືອກເຫຼັກ, ແລະອື່ນໆ, ແລະສ່ວນໃຫຍ່ແມ່ນນໍາໃຊ້ໃນການສ້ອມແປງອອກກໍາແພງ, ແລະການເຮັດຄວາມສະອາດຫນ້າຕ່າງ.
1. ຂໍ້ກໍານົດດ້ານວິຊາການ
| ຕົວແບບ | ZLP800 | |
| ສາຍສາຍ / ສາຍເຊືອກສາຍຍາວ | 100 ເມດ | |
| Rated load | 800Kgs | |
| ຄວາມໄວການຍົກ | 96M / Min | |
| ຂະຫນາດຂອງເວທີ (L * W * H) | 7500MM * 690MM * 1300MM | |
| ເສັ້ນຜ່ານສູນກາງຂອງເຫລັກ | 91MM | |
| Hoist | ພະລັງງານ | 2 * 18Kw |
| ແຮງດັນ | 380V, 50HZ, 3 Phases | |
| ລັອກຄວາມປອດໄພ | ຜົນບັງຄັບໃຊ້ຜົນກະທົບສູງສຸດ | 30KN |
| ລັອກສາຍເຄເບີ້ນ | 3º-8º | |
| ກົນໄກການຢຸດເຊົາ | ຫນ້າເບື້ອງຂວາງ | 13-17M |
| ສະຫນັບສະຫນູນຄວາມສູງປັບໄດ້ | 144-214M | |
| ລໍ້ດ້ານລຸ່ມ | 4 Pcs | |
| Concrete counter weight | 1000Kg | |
| ລໍ້ Caster ພາຍໃຕ້ເວທີ | 4 Pcs | |
2 ຜະລິດຕະພັນ

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our window cleaning cleaning system, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.