{"id":371,"date":"2018-10-11T09:12:14","date_gmt":"2018-10-11T09:12:14","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=371"},"modified":"2026-06-23T01:53:24","modified_gmt":"2026-06-23T01:53:24","slug":"hreint-galvaniserad-hengdur-vinnandi-pallur-zlp630-har-risa-byggingu-byggingu","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/is\/hot-galvanized-suspended-working-platform-zlp630-high-rise-building-construction.html","title":{"rendered":"Hot-Galvanized ZLP630 Platform for High-Rise Construction"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hot-Galvanized ZLP630 Platform for High-Rise Construction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Hot-Galvanized ZLP630 Platform for High-Rise Construction<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp630, 50HZ, 60HZ. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"640\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/galvanized-suspended-aerial-work-platform-price-5-1.jpg\" alt=\"galvaniseru\u00f0u-loftnet-vinnuv\u00e9lar-ver\u00f0 (5)\" class=\"wp-image-372\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/galvanized-suspended-aerial-work-platform-price-5-1.jpg 640w, https:\/\/www.sewbc.com\/wp-content\/uploads\/galvanized-suspended-aerial-work-platform-price-5-1-150x150.jpg 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/galvanized-suspended-aerial-work-platform-price-5-1-300x300.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/galvanized-suspended-aerial-work-platform-price-5-1-50x50.jpg 50w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u00cdtarlegar v\u00f6rul\u00fdsing<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">Heitt galvanisera\u00f0 fresta\u00f0 vinnuvettvangur ZLP630 fyrir byggingarbyggingu<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Forrit:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">1. V\u00ed\u00f0a nota\u00f0 \u00ed byggingu, skreytingu, hreinsun og vi\u00f0haldi h\u00e1bygginga;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. M\u00e1lverk, skraut og endurn\u00fdjun utanveggja;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Sko\u00f0un og vi\u00f0hald st\u00f3ru skri\u00f0dreka, strompinnst\u00f6ng, turn, vatnslind, br\u00fa og svo framvegis.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Forskrift:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Ger\u00f0 nr.<\/td><td>ZLP630<\/td><\/tr><tr><td colspan=\"2\">\u00c1lags\u00feyngd (kg)<\/td><td>630<\/td><\/tr><tr><td colspan=\"2\">Lyftihra\u00f0i (m \/ m\u00edn)<\/td><td>9 ~ 11<\/td><\/tr><tr><td colspan=\"2\">M\u00f3torafl (kw)<\/td><td>2 \u00d7 1,5 50Hz \/ 60Hz<\/td><\/tr><tr><td colspan=\"2\">Brake veltingur (Km)<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Stillingarm\u00f6rk hornshor\u00f0a (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Fjarl\u00e6g\u00f0 milli tveggja st\u00e1ltappa (mm)<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Meti\u00f0 teygja framhlj\u00f3ms (mm)<\/td><td>1500<\/td><\/tr><tr><td rowspan=\"5\">Upph\u00e6\u00f0 vettvangs<\/td><td>L\u00e6sa<\/td><td>\u00c1l<\/td><\/tr><tr><td>Nr.Of pallur rekki<\/td><td>Single rekki<\/td><\/tr><tr><td>Nr.Of pallur<\/td><td>3<\/td><\/tr><tr><td>L \u00d7 W \u00d7 H (mm)<\/td><td>(2000 \u00d7 3) \u00d7 690 \u00d7 1180<\/td><\/tr><tr><td>\u00deyngd (kg)<\/td><td>375 kg<\/td><\/tr><tr><td colspan=\"2\">St\u00f6\u00f0vunarb\u00fana\u00f0ur (kg)<\/td><td>2 \u00d7 175 Kg<\/td><\/tr><tr><td colspan=\"2\">M\u00f3tv\u00e6gi (kg) valfrj\u00e1lst<\/td><td>25 \u00d7 36 stk<\/td><\/tr><tr><td colspan=\"2\">\u00deverm\u00e1l reipi \u00far st\u00e1li (mm)<\/td><td>8.3<\/td><\/tr><tr><td colspan=\"2\">Max Lyftih\u00e6\u00f0 (m)<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Sn\u00faningshra\u00f0i hreyfils (r \/ m\u00edn)<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Spenna (v) 3PHASES<\/td><td>220V \/ 380V \/ 415V (s\u00e9rsni\u00f0in)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Kostir okkar:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">1. Fagleg g\u00e6\u00f0i: Vi\u00f0 h\u00f6fum 9 \u00e1ra reynslu af \u00fev\u00ed a\u00f0 gera t\u00edmabundnar vinnuv\u00e9lar \u00ed K\u00edna.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Hagst\u00e6\u00f0 ver\u00f0: Vi\u00f0 getum gert \u00fe\u00e9r grei\u00f0a byggt \u00e1 st\u00f6\u00f0u verksmi\u00f0ju okkar s\u00e9rstaklega fyrir st\u00f3rt magn.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Flj\u00f3tur afhendingu: M\u00e1na\u00f0arlega birg\u00f0ir okkar meira en 1000 setur.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. D\u00e6miger\u00f0 \u00fej\u00f3nusta: Fr\u00e1b\u00e6r s\u00f6luteymi okkar geymir allan daginn t\u00f6lvup\u00f3st og 24 klst. TradeManager \u00e1 netinu. Verkfr\u00e6\u00f0ingar halda hvetjandi svari fyrir \u00f6llum spurningum.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Vi\u00f0 getum s\u00e9rsni\u00f0i\u00f0 vettvanginn \u00fear \u00e1 me\u00f0al hlutum \u00ed samr\u00e6mi vi\u00f0 kr\u00f6fur \u00fe\u00ednar.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A\u00f0alhlutar:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"567\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Main-Components-1.jpg\" alt=\"Hot-Galvanized ZLP630 Platform for High-Rise Construction - image 2\" class=\"wp-image-373\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Main-Components-1.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Main-Components-1-300x284.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Verkefni:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects4.jpg\" alt=\"Hot-Galvanized ZLP630 Platform for High-Rise Construction - image 3\" class=\"wp-image-352\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects4.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects4-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"578\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects3-1.jpg\" alt=\"Hot-Galvanized ZLP630 Platform for High-Rise Construction - image 4\" class=\"wp-image-351\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects3-1.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects3-1-300x289.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects1-1.jpg\" alt=\"Hot-Galvanized ZLP630 Platform for High-Rise Construction - image 5\" class=\"wp-image-345\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects1-1.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects1-1-150x150.jpg 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects1-1-300x300.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Projects1-1-50x50.jpg 50w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/is\/stodvandi-vinnandi-pallur\/\">fresta\u00f0 vinnuvettvangur<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/is\/flokki\/vorur\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/is\/hafdu-samband-vid-okkur\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Hot-Galvanized ZLP630 Platform for High-Rise Construction. Review specifications, applications, configuration options and project information required before <\/p>","protected":false},"author":1,"featured_media":372,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,3],"tags":[14,15,17],"class_list":["post-371","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-suspended-working-platform-manufacturer","tag-suspended-scaffold-platform","tag-temporary-suspended-platform","tag-zlp-630-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/posts\/371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/comments?post=371"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/posts\/371\/revisions"}],"predecessor-version":[{"id":1389,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/posts\/371\/revisions\/1389"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/media\/372"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/media?parent=371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/categories?post=371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/tags?post=371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}