{"id":266,"date":"2018-10-07T02:50:02","date_gmt":"2018-10-07T02:50:02","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=266"},"modified":"2026-06-23T01:53:46","modified_gmt":"2026-06-23T01:53:46","slug":"zlp-500-lp-630-timabundid-frestad-vir-reipi-pallur-bygging","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/is\/zlp-500-lp-630-temporarily-suspended-wire-rope-platform-building.html","title":{"rendered":"ZLP500 ZLP630 Rope Suspended Platform"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ZLP500 ZLP630 Rope Suspended Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>ZLP500 ZLP630 Rope Suspended Platform<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp 500, ZLP 630. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image alignnone size-full wp-image-267\"><img loading=\"lazy\" decoding=\"async\" width=\"781\" height=\"782\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Platform-Without-Counter-Weight-3.png\" alt=\"ZLP500 ZLP630 Rope Suspended Platform\" class=\"wp-image-267\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Platform-Without-Counter-Weight-3.png 781w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Platform-Without-Counter-Weight-3-150x150.png 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Platform-Without-Counter-Weight-3-300x300.png 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Platform-Without-Counter-Weight-3-768x769.png 768w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Platform-Without-Counter-Weight-3-50x50.png 50w\" sizes=\"auto, (max-width: 781px) 100vw, 781px\" \/><figcaption class=\"wp-element-caption\"><strong>\u00cdtarlegar v\u00f6rul\u00fdsing<\/strong><br><strong>ZLP 500 LP 630 t\u00edmabundi\u00f0 fresta\u00f0 v\u00edrtappa fyrir byggingu<\/strong><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Verksmi\u00f0ju okkar:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Shanghai Velgengni Framkv\u00e6mdir International Trade Co Ltd er stofna\u00f0 \u00e1ri\u00f0 2008. \u00dea\u00f0 er lei\u00f0andi h\u00e1t\u00e6kni fyrirt\u00e6ki sem s\u00e9rh\u00e6fir sig \u00ed ranns\u00f3knum, \u00fer\u00f3un og framlei\u00f0anda rafmagns bi\u00f0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Platform, byggja hoist og a\u00f0rar \u00fdmis konar b\u00fana\u00f0 byggingu. V\u00f6rur okkar me\u00f0 faglega g\u00e6\u00f0um, samkeppnish\u00e6f ver\u00f0 og flj\u00f3tur afhendingu. Vi\u00f0 getum s\u00e9rsni\u00f0i\u00f0 \u00ed samr\u00e6mi vi\u00f0 kr\u00f6fur \u00fe\u00ednar.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"5760\" height=\"3840\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/N24A0424.jpg\" alt=\"ZLP500 ZLP630 Rope Suspended Platform - image 2\" class=\"wp-image-268\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/N24A0424.jpg 5760w, https:\/\/www.sewbc.com\/wp-content\/uploads\/N24A0424-300x200.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/N24A0424-768x512.jpg 768w, https:\/\/www.sewbc.com\/wp-content\/uploads\/N24A0424-1024x683.jpg 1024w\" sizes=\"auto, (max-width: 5760px) 100vw, 5760px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Forrit:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.Hreinsa og vi\u00f0halda ytri vegg h\u00e1r-r\u00edsa bygging.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. M\u00e1lverk, skraut og endurn\u00fdjun utanveggja.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Uppsetningarverkefni og \u00f6nnur sm\u00ed\u00f0i sem vinnur a\u00f0 ytri veggi h\u00e1h\u00fassbyggingar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Loftvinnsla skips, st\u00f3rt turn, br\u00fa, st\u00edflur og st\u00f3r strompinn.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Setja upp og vi\u00f0halda h\u00e1h\u00e6\u00f0ab\u00fana\u00f0i, lyftib\u00fana\u00f0i, skipasm\u00ed\u00f0i i\u00f0na\u00f0i, siglingaskipum, str\u00ed\u00f0sh\u00f6ftsv\u00f6rn.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Uppl\u00fdsingar:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Property \/ &nbsp;Model No.<\/td><td>ZLP500<\/td><td>ZLP630<\/td><\/tr><tr><td colspan=\"2\">\u00c1lags\u00feyngd (kg)<\/td><td>500<\/td><td>630<\/td><\/tr><tr><td colspan=\"2\">Lyftihra\u00f0i (m \/ m\u00edn)<\/td><td>9 ~ 11<\/td><td>9 ~ 11<\/td><\/tr><tr><td colspan=\"2\">M\u00f3torafl (kw)<\/td><td>2 \u00d7 1,5 50Hz \/ 60Hz<\/td><td>2 \u00d7 1,5 50Hz \/ 60Hz<\/td><\/tr><tr><td colspan=\"2\">Brake veltingur (Km)<\/td><td>16<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Stillingarm\u00f6rk hornshor\u00f0a (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Fjarl\u00e6g\u00f0 milli tveggja st\u00e1ltappa (mm)<\/td><td>\u2264100<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Meti\u00f0 teygja framhlj\u00f3ms (mm)<\/td><td>1500<\/td><td>1500<\/td><\/tr><tr><td>Upph\u00e6\u00f0 vettvangs<\/td><td>L\u00e6sa<\/td><td>\u00c1l<\/td><td>\u00c1l<\/td><\/tr><tr><td><\/td><td>Nr.Of pallur rekki<\/td><td>Single rekki<\/td><td>Single rekki<\/td><\/tr><tr><td><\/td><td>Nr.Of pallur<\/td><td>2<\/td><td>3<\/td><\/tr><tr><td><\/td><td>L \u00d7 W \u00d7 H (mm)<\/td><td>(2000 \u00d7 2) \u00d7 690 \u00d7 1300<\/td><td>(2000 \u00d7 3) \u00d7 690 \u00d7 1300<\/td><\/tr><tr><td><\/td><td>\u00deyngd (kg)<\/td><td>350 kg<\/td><td>375 kg<\/td><\/tr><tr><td colspan=\"2\">St\u00f6\u00f0vunarb\u00fana\u00f0ur (kg)<\/td><td>2 \u00d7 175 Kg<\/td><td>2 \u00d7 175 Kg<\/td><\/tr><tr><td colspan=\"2\">M\u00f3tv\u00e6gi (kg) valfrj\u00e1lst<\/td><td>25 \u00d7 30 stk<\/td><td>25 \u00d7 36 stk<\/td><\/tr><tr><td colspan=\"2\">\u00deverm\u00e1l reipi \u00far st\u00e1li (mm)<\/td><td>8.3<\/td><td>8.3<\/td><\/tr><tr><td colspan=\"2\">Max Lyftih\u00e6\u00f0 (m)<\/td><td>300<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Sn\u00faningshra\u00f0i hreyfils (r \/ m\u00edn)<\/td><td>1420<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Spenna (v) 3PHASES<\/td><td>220V \/ 380V \/<p><\/p>\n<p>415V<\/p><\/td><td>220V \/ 380V \/<p><\/p>\n<p>415V<\/p><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A\u00f0alhlutar:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"500\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827145750_77175.jpg\" alt=\"ZLP500 ZLP630 Rope Suspended Platform - image 3\" class=\"wp-image-269\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827145750_77175.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827145750_77175-300x250.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>P\u00f6kkun:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"138\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827170605_40504.jpg\" alt=\"ZLP500 ZLP630 Rope Suspended Platform - image 4\" class=\"wp-image-270\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827170605_40504.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827170605_40504-300x69.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"150\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827170619_83833.jpg\" alt=\"ZLP500 ZLP630 Rope Suspended Platform - image 5\" class=\"wp-image-271\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827170619_83833.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20140827170619_83833-300x75.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/is\/reipistodvum\/\">reipi st\u00f6\u00f0va\u00f0ur pallur<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/is\/flokki\/vorur\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/is\/hafdu-samband-vid-okkur\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>ZLP500 ZLP630 Rope Suspended Platform. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":267,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,4],"tags":[10,16,15,17,19],"class_list":["post-266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-rope-suspended-platform-manufacturer","tag-suspended-platform-hoist","tag-suspended-wire-rope-platform","tag-temporary-suspended-platform","tag-zlp-630-suspended-platform","tag-zlp-800-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/posts\/266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/comments?post=266"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/posts\/266\/revisions"}],"predecessor-version":[{"id":1409,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/posts\/266\/revisions\/1409"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/media\/267"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/media?parent=266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/categories?post=266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/is\/wp-json\/wp\/v2\/tags?post=266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}