ZLP630 Rope Suspended Platform
ZLP630 Rope Suspended Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp 630, ZLP630, 630 KG. These values should be confirmed against the final supplied configuration and destination power supply.

Sementara Dipasang Tali Suspended Platform / Cradle / Gondola / Scaffolding / Swing Stage ZLP630
Detail Cepat:
1. Model No .: ZLP630
2. Nama Merek: SUCCESS
3. Bahan: Baja / Aluminium
4. Penampilan: Plastik Spray Painted / Hot Galvanized
5. Kapasitas Pemuatan: 630 KG
6. Lifting Height: Maksimum 300 Mts
7. Counterweight: Beton, Beton dengan penutup baja, Besi
Spesifikasi:
| Nama | Technical parameter | ||
| Model | ZLP800 | ZLP630 | |
| Rated load | 800Kg | 630Kg | |
| Lifting speed | 9-11m / mnt | 1-11m / mnt | |
| Platform Dimension L×W×H(mm) | 7500 × 690 × 1450 | 6000 × 690 × 1450 | |
| Lifting Height | 100 m | 100 m | |
| Kabel | 100 m | 100 m | |
| Steel rope | Ф9.1mm | Ф8.3mm | |
| Kerekan | Kekuasaan | 1.8KW * 2 | 1.5KW * 2 |
| Voltase | 440V / 50HZ | 440V / 50HZ | |
| Safety lock | Permission force of impact | 30KN | 30KN |
| Locking Cable Angle | 3 ° ~ 8 ° | 3 ° ~ 8 ° | |
| Penangguhan
mekanisme | Front beam overhang | 1.3 ~ .1.5m | 1.3 ~ .1.5m |
| Support adjustable height | 1.44 ~ 2.14m | 1.44 ~ 2.14m | |
| Pengimbang | 1000kg | 1000kg | |
| 20’ft container | 8 sets | 9 sets | |
Komponen dan Proyek:

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our platform tali ditangguhkan, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.