ZLP630 Platform Material Options for Facade Painting
ZLP630 Platform Material Options for Facade Painting is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp630, 630kg. These values should be confirmed against the final supplied configuration and destination power supply.

Baja Painted / Hot Galvanized / Aluminium ZLP630 Platform Kerja yang Ditangguhkan Untuk Fasad Bangunan Lukisan
Pembersihan jendela listrik Platform Kerja yang Ditangguhkan terutama digunakan dalam aspek-aspek berikut:
1. perawatan dan pembersihan eksterior bangunan bertingkat tinggi,
2. Inspeksi konstruksi dan pemeliharaan tangki ukuran besar, cerobong asap, bendungan, jembatan dan derek.
3, pengelasan, pembersihan dan pengecatan kapal ukuran besar.
Lembar Data Teknis untuk Platform yang ditangguhkan ZLP630:
| model | zlp630 |
| beban pengenal | 630kg |
| Jumlah platform | 3 bagian |
| kecepatan angkat | 9,6 m / mnt |
| Ukuran platform | (2000 x 3) x 690 x 1300 mm |
| mekanisme suspensi | 2 x 175 kg |
| tenaga motor | 2 x 1,5 kw |
| Voltase | 380V / 220V / 415V / 440V, 50HZ / 60HZ, 3 Phase |
| bahan | baja atau aluminium |
| Counter Berat | 900kg, semen saja; penutup baja + semen; besi cor; |
Keterangan:
1.SUCCESS juga dapat memproduksi ZLP250, ZLP500, ZLP800, ZLP1000 platform ditangguhkan.
2. Kami juga memiliki layanan OEM dan ODM.
3. Jam layanan: 24 jam * 365 hari.



Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our platform kerja ditangguhkan, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
