{"id":740,"date":"2018-10-16T08:42:27","date_gmt":"2018-10-16T08:42:27","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=740"},"modified":"2026-06-23T01:52:09","modified_gmt":"2026-06-23T01:52:09","slug":"ce-tanusitvannyal-zlp630-aluminium-elektromos-fuggesztett-gondola-epites","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/hu\/ce-tanusitott-zlp630-aluminium-elektromos-logo-gondola-construction-html","title":{"rendered":"Aluminum ZLP630 Suspended Gondola Platform for Construction"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Aluminum ZLP630 Suspended Gondola Platform for Construction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Aluminum ZLP630 Suspended Gondola Platform for Construction<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp630. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"780\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-1.png\" alt=\"Aluminum ZLP630 Suspended Gondola Platform for Construction\" class=\"wp-image-745\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-1.png 780w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-1-150x150.png 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-1-300x300.png 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-1-768x768.png 768w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-1-50x50.png 50w\" sizes=\"auto, (max-width: 780px) 100vw, 780px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Alapinform\u00e1ci\u00f3<\/strong><br>\nModellsz\u00e1m: ZLP630<br>\nHorgonyoz\u00e1si lehet\u0151s\u00e9gek: Felf\u00fcggeszt\u00e9s f\u00fav\u00f3k\u00e1k<br>\nPlatform szerel\u00e9s: csavaros t\u00edpus<br>\nTan\u00fas\u00edtv\u00e1ny: ISO9001: 2008 \/ Ce \/ TUV<br>\nSz\u00e1ll\u00edt\u00e1si csomag: Kartondoboz + R\u00e9tegelt lemez raklap + R\u00e9tegelt lemez<br>\nSpecifik\u00e1ci\u00f3: ZLP630<br>\nSz\u00e1rmaz\u00e1si hely: Shanghai, K\u00edna<br>\nK\u00f3d: 8428909090<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A ZLP sorozat ideiglenes alkalmaz\u00e1sokra szolg\u00e1l emberek \u00e9s munkaeszk\u00f6zeik emel\u00e9s\u00e9re - korl\u00e1tlan magass\u00e1gban.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A modell t\u00f6k\u00e9letesen illeszkedik a k\u00f6nny\u0171 alkalmaz\u00e1sokhoz, p\u00e9ld\u00e1ul a fest\u00e9shez, d\u00edsz\u00edt\u00e9shez, fel\u00faj\u00edt\u00e1shoz, \u00f6sszeszerel\u00e9shez \u00e9s jav\u00edt\u00e1sokhoz, ablakok tiszt\u00edt\u00e1s\u00e1hoz stb. A teljes rendszer k\u00e9t elektromos LTD emel\u0151vel \u00e9s a tart\u00f3 kerekekkel van ell\u00e1tva, amelyek ac\u00e9l dr\u00f3tk\u00f6telekkel vannak felf\u00fcggesztve egy felf\u00fcggeszt\u00e9si szerkezet.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Biztons\u00e1gi rendszerek<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A szem\u00e9lyzet vesz\u00e9lyeztet\u00e9se n\u00e9lk\u00fcli biztons\u00e1gos \u00fczemeltet\u00e9s \u00e9rdek\u00e9ben a platformot a k\u00f6vetkez\u0151 biztons\u00e1gi berendez\u00e9sekkel szerelik fel:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. A szervizf\u00e9k be\u00e9p\u00edt\u00e9se a LTD emel\u0151berendez\u00e9sbe.<br>\n2. A biztons\u00e1gi zsin\u00f3rokra hat\u00f3 k\u00e9t elz\u00e1r\u00f3 berendez\u00e9s.<br>\n3. K\u00e9t fels\u0151 hat\u00e1r-kapcsol\u00f3.<br>\n4. \u00c1ramkimarad\u00e1s eset\u00e9n nincs \u00e1ramkimarad\u00e1s.<br>\n5. V\u00e9szle\u00e1ll\u00e1s.<br>\n6. F\u00e1zisvez\u00e9rl\u0151. (V\u00e1laszt\u00e1si lehet\u0151s\u00e9g)<br>\n7. A LTD emel\u0151berendez\u00e9sekbe be\u00e9p\u00edtett t\u00falterhel\u00e9s\u00e9rz\u00e9kel\u0151 az EN 1808 szerint. (Opci\u00f3)<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"5\"><strong>A ZLP sorozat\u00fa felf\u00fcggesztett platform param\u00e9terei<\/strong><\/td><\/tr><tr><td>Type<\/td><td>ZLP500<\/td><td>ZLP630<\/td><td>ZLP800<\/td><td>ZLP1000<\/td><\/tr><tr><td>N\u00e9vleges teher<\/td><td>500kg<\/td><td>630kg<\/td><td>800kg<\/td><td>1000kg<\/td><\/tr><tr><td>Emel\u00e9si sebess\u00e9g<\/td><td>9m \/ min<\/td><td>9m \/ min<\/td><td>9m \/ min<\/td><td>8.7m \/ min<\/td><\/tr><tr><td>Fesz\u00fclts\u00e9g-3 f\u00e1zis\u00fa<\/td><td>380V (415V \/ 220V)<\/td><td>380V (415V \/ 220V)<\/td><td>380V (415V \/ 220V)<\/td><td>380V (415V \/ 220V)<\/td><\/tr><tr><td>Frekvencia<\/td><td>50Hz \/ 60Hz<\/td><td>50Hz \/ 60Hz<\/td><td>50Hz \/ 60Hz<\/td><td>50Hz \/ 60Hz<\/td><\/tr><tr><td>Er\u0151<\/td><td>1.1 \u00d7 2<\/td><td>1.5 \u00d7 2<\/td><td>1.8 \u00d7 2<\/td><td>2,0 \u00d7 2<\/td><\/tr><tr><td>Emel\u0151<\/td><td>LTD50<\/td><td>LTD63<\/td><td>LTD80<\/td><td>LTD100<\/td><\/tr><tr><td>Biztons\u00e1gi z\u00e1r<\/td><td>LSF308<\/td><td>LSF308<\/td><td>LSF309<\/td><td>LSF310<\/td><\/tr><tr><td>Dia.of huzalk\u00f6t\u00e9l<\/td><td>4 \u00d7 31SW + FC-8.3mm<\/td><td>4 \u00d7 31SW + FC-8.3mm<\/td><td>4 \u00d7 31SW + FC-9.1mm<\/td><td>4 \u00d7 31SW + FC-10.2mm<\/td><\/tr><tr><td>Platform Size&nbsp;&nbsp;(L\u00d7W\u00d7H)<\/td><td>(2,5 \u00d7 2) \u00d7 0,76 \u00d7 1,45<\/td><td>(2 \u00d7 3) \u00d7 0,76 \u00d7 1,45<\/td><td>(2,5 \u00d7 3) \u00d7 0,76 \u00d7 1,45<\/td><td>(2,5 \u00d7 3) \u00d7 0,76 \u00d7 1,45<\/td><\/tr><tr><td>Suspended Jibs s\u00falya<\/td><td>340kg<\/td><td>340kg<\/td><td>340kg<\/td><td>340kg<\/td><\/tr><tr><td>Az emel\u0151 r\u00e9sz s\u00falya<\/td><td>410kg (Steel)<br>\n290kg (alum\u00ednium)<\/td><td>450kg (Steel)<br>\n310kg (alum\u00ednium)<\/td><td>520kg (Steel)<br>\n340kg (alum\u00ednium)<\/td><td>520kg (Steel)<br>\n340kg (alum\u00ednium)<\/td><\/tr><tr><td>Sz\u00e1ml\u00e1l\u00f3<\/td><td>800kgs<\/td><td>900kgs<\/td><td>1000kgs<\/td><td>1200kgs<\/td><\/tr><tr><td>20GP csomag mennyis\u00e9ge<\/td><td>10sets<\/td><td>10sets<\/td><td>9Sets<\/td><td>9Sets<\/td><\/tr><tr><td colspan=\"5\"><strong><em>* Az emel\u0151 r\u00e9sz s\u00falya platform, emel\u0151, biztons\u00e1gi z\u00e1r \u00e9s elektromos vez\u00e9rl\u0151 rendszer.<\/em><\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"304\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Ce-Certified-Zlp630-Aluminium-Electric-Hanging-Gondola-for-Construction.jpg\" alt=\"Aluminum ZLP630 Suspended Gondola Platform for Construction - image 2\" class=\"wp-image-749\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Ce-Certified-Zlp630-Aluminium-Electric-Hanging-Gondola-for-Construction.jpg 750w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Ce-Certified-Zlp630-Aluminium-Electric-Hanging-Gondola-for-Construction-300x122.jpg 300w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/hu\/felfuggesztett-gondola\/\">f\u00fcggesztett gondola<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/hu\/kategoria\/termekek\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/hu\/lepjen-kapcsolatba-velunk\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Aluminum ZLP630 Suspended Gondola Platform for Construction. Review specifications, applications, configuration options and project information required befor<\/p>","protected":false},"author":1,"featured_media":745,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[20,18,15,17,19],"class_list":["post-740","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspended-gondola-manufacturer","tag-suspended-personnel-platform","tag-suspended-platform-gondola","tag-temporary-suspended-platform","tag-zlp-630-suspended-platform","tag-zlp-800-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/comments?post=740"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/740\/revisions"}],"predecessor-version":[{"id":1327,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/740\/revisions\/1327"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/media\/745"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/media?parent=740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/categories?post=740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/tags?post=740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}