{"id":597,"date":"2018-10-13T02:50:03","date_gmt":"2018-10-13T02:50:03","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=597"},"modified":"2026-06-23T01:52:40","modified_gmt":"2026-06-23T01:52:40","slug":"testreszabott-zlp1000-felfuggesztett-access-allvanyok-karbantartas-bolcso-acel-kotel-8-6mm","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/hu\/customized-zlp1000-suspended-access-platforms-maintenance-cradle-steel-rope-8-6mm.html","title":{"rendered":"Steel ZLP1000 Suspended Access Platform for Building Maintenance"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Steel ZLP1000 Suspended Access Platform for Building Maintenance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Steel ZLP1000 Suspended Access Platform for Building Maintenance<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp1000, 1000KG, 1000 KG, 2.5M, 2.2KW, 8.6mm. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"452\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Steel-Hot-Galvanized-Aluminium-Alloy-Rope-Suspended-Platform-1.5KW-380V-50HZ-1.jpg\" alt=\"Ac\u00e9l horganyzott alum\u00ednium \u00f6tv\u00f6zetb\u0151l k\u00e9sz\u00fclt k\u00f6t\u00e9l felf\u00fcggesztett platform 1.5KW 380V 50HZ\" class=\"wp-image-446\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Steel-Hot-Galvanized-Aluminium-Alloy-Rope-Suspended-Platform-1.5KW-380V-50HZ-1.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Steel-Hot-Galvanized-Aluminium-Alloy-Rope-Suspended-Platform-1.5KW-380V-50HZ-1-300x226.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">R\u00e9szletes term\u00e9kle\u00edr\u00e1s<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">Testreszabott 2,5M * 3, 1000KG 2,2KW felf\u00fcggesztett hozz\u00e1f\u00e9r\u00e9si platform ZLP1000 ac\u00e9lk\u00f6telekkel 8,6 mm<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gyors r\u00e9szletek:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Modellsz\u00e1m: ZLP1000<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. M\u00e1rka neve: SIKER<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Anyag: ac\u00e9l \/ alum\u00ednium<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Megjelen\u00e9s: m\u0171anyag spray festett \/ horganyzott<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Kapacit\u00e1s felt\u00f6lt\u00e9s: 1000 KG<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">6. Emel\u00e9si magass\u00e1g: 300 m<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">7. Ellens\u00faly: Beton, Beton ac\u00e9l burkolattal, Vas<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Alkalmaz\u00e1sok:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">1. A magas \u00e9p\u00fcletek k\u00fcls\u0151 fal\u00e1nak tiszt\u00edt\u00e1sa \u00e9s karbantart\u00e1sa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. K\u00fcls\u0151 falak fest\u00e9se, d\u00edsz\u00edt\u00e9se \u00e9s fel\u00faj\u00edt\u00e1sa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. A magas \u00e9p\u00fcletek k\u00fcls\u0151 falainak szerel\u00e9se \u00e9s egy\u00e9b \u00e9p\u00edt\u00e9si munk\u00e1i.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. A haj\u00f3, a nagy torony, a h\u00edd, a g\u00e1tak \u00e9s a nagy k\u00e9m\u00e9nyek l\u00e9giforgalmi munk\u00e1ja.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Telep\u00edt\u00e9s \u00e9s karbantart\u00e1s magas emeletes \u00e9p\u00fcletemel\u0151 felvon\u00f3, haj\u00f3\u00e9p\u00edt\u0151 ipar, tengerj\u00e1r\u00f3 haj\u00f3, hadihaj\u00f3 hegeszt\u00e9s fenntart\u00e1sa.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">M\u0171szaki adatok<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Model sz\u00e1m.<\/td><td>ZLP1000<\/td><\/tr><tr><td colspan=\"2\">N\u00e9vleges terhel\u00e9s (kg)<\/td><td>1000<\/td><\/tr><tr><td colspan=\"2\">Emel\u00e9si sebess\u00e9g (m \/ perc)<\/td><td>8 ~ 10<\/td><\/tr><tr><td colspan=\"2\">Motor teljes\u00edtm\u00e9ny (kw)<\/td><td>2 \u00d7 2,2, 50 Hz \/ 60 Hz<\/td><\/tr><tr><td colspan=\"2\">F\u00e9knyomat\u00e9k (Km)<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Ac\u00e9l k\u00f6t\u00e9lsz\u00f6g be\u00e1ll\u00edt\u00e1si tartom\u00e1ny (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">A k\u00e9t ac\u00e9lk\u00f6t\u00e9l (mm) k\u00f6z\u00f6tti t\u00e1vols\u00e1g<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Az el\u00fcls\u0151 f\u00e9nynyal\u00e1b n\u00e9vleges ny\u00falv\u00e1nya (mm)<\/td><td>1500<\/td><\/tr><tr><td>Felf\u00fcggesztett platform<\/td><td>Z\u00e1r\u00f3<\/td><td>Alum\u00ednium \u00f6tv\u00f6zet<\/td><\/tr><tr><td><\/td><td>Nr.Of platformtart\u00f3<\/td><td>Egyetlen rack<\/td><\/tr><tr><td><\/td><td>Nr.Of platform<\/td><td>3<\/td><\/tr><tr><td><\/td><td>L \u00d7 W \u00d7 H (mm)<\/td><td>(2500 \u00d7 3) \u00d7 690 \u00d7 1180<\/td><\/tr><tr><td><\/td><td>T\u00f6meg (kg)<\/td><td>455&nbsp;Kg<\/td><\/tr><tr><td colspan=\"2\">Felf\u00fcggeszt\u00e9si mechanizmus (kg)<\/td><td>2 \u00d7 175 kg<\/td><\/tr><tr><td colspan=\"2\">Ellens\u00faly (kg) opcion\u00e1lis<\/td><td>25 \u00d7 44pcs<\/td><\/tr><tr><td colspan=\"2\">Ac\u00e9lk\u00f6tel \u00e1tm\u00e9r\u0151je (mm)<\/td><td>8.6<\/td><\/tr><tr><td colspan=\"2\">Max Emel\u00e9si magass\u00e1g (m)<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Motor forg\u00e1si sebess\u00e9ge (r \/ min)<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Fesz\u00fclts\u00e9g (v) 3PHASES<\/td><td>220V \/ 380V \/ 415V (testreszabott)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Versenyel\u0151ny\u00f6k<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">1. Biztos\u00edtja az \u00e9letbiztos\u00edt\u00e1st az antenna \u00fczem k\u00f6zben<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A biztons\u00e1gi z\u00e1r az ac\u00e9lk\u00f6telet azonnal r\u00f6gz\u00edtse, miut\u00e1n a felf\u00fcggesztett platform elfordul vagy az ac\u00e9lk\u00f6t\u00e9l kiugrik az emel\u0151r\u0151l;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Az elektromos szab\u00e1lyoz\u00f3rendszer sziv\u00e1rg\u00e1s elleni v\u00e9delemmel, t\u00falmeleged\u00e9ssel, t\u00falterhel\u00e9s elleni v\u00e9delemmel \u00e9s f\u00e9k\u00fctk\u00f6z\u0151kkel van felszerelve;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">J\u00f3 min\u0151s\u00e9g\u0171 ac\u00e9l dr\u00f3tk\u00f6t\u00e9l, biztons\u00e1gi k\u00f6t\u00e9l \u00e9s k\u00e1bel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Stabil teljes\u00edtm\u00e9ny: emelje fel \u00e9s lefel\u00e9 lefel\u00e9<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Modul\u00e1ris kialak\u00edt\u00e1s. K\u00f6nny\u0171 sz\u00e9tszerelni, \u00f6ssze\u00e1ll\u00edtani \u00e9s karbantartani.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Az emel\u00e9si magass\u00e1g az ig\u00e9nyeknek megfelel\u0151en \u00e1ll\u00edthat\u00f3 (legfeljebb 300 m\u00e9ter)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. \u00dczemi fesz\u00fclts\u00e9g \u00e9s frekvencia \u00e1ll\u00edthat\u00f3 (220V \/ 380V \/ 415V stb.)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">6. A speci\u00e1lis haszn\u00e1latra sz\u00e1nt felf\u00fcggesztett platform testreszabhat\u00f3 (k\u00f6r alak\u00fa, L alak\u00fa, U alak\u00fa, stb.)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">7. Professzion\u00e1lis min\u0151s\u00e9g, versenyk\u00e9pes \u00e1r, gyors sz\u00e1ll\u00edt\u00e1s, j\u00f3 szolg\u00e1ltat\u00e1sok.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"391\" height=\"416\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Applications1-3.jpg\" alt=\"Steel ZLP1000 Suspended Access Platform for Building Maintenance - image 2\" class=\"wp-image-598\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Applications1-3.jpg 391w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Applications1-3-282x300.jpg 282w\" sizes=\"auto, (max-width: 391px) 100vw, 391px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"396\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Components-1.jpg\" alt=\"Steel ZLP1000 Suspended Access Platform for Building Maintenance - image 3\" class=\"wp-image-599\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Components-1.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Components-1-300x198.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Components-1-370x245.jpg 370w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Factory1-4.jpg\" alt=\"Steel ZLP1000 Suspended Access Platform for Building Maintenance - image 4\" class=\"wp-image-600\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Factory1-4.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Factory1-4-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Factory2-5.jpg\" alt=\"Steel ZLP1000 Suspended Access Platform for Building Maintenance - image 5\" class=\"wp-image-601\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Factory2-5.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Factory2-5-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/hu\/felfuggesztett-access-allvanyok\/\">felf\u00fcggesztett hozz\u00e1f\u00e9r\u00e9si platformok<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/hu\/kategoria\/termekek\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/hu\/lepjen-kapcsolatba-velunk\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Steel ZLP1000 Suspended Access Platform for Building Maintenance. Review specifications, applications, configuration options and project information required <\/p>","protected":false},"author":1,"featured_media":446,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,5],"tags":[11,10,14,16,15],"class_list":["post-597","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-suspended-access-platforms-manufacturer","tag-suspended-platform-cradle","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-suspended-wire-rope-platform","tag-temporary-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/comments?post=597"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/597\/revisions"}],"predecessor-version":[{"id":1353,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/597\/revisions\/1353"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/media\/446"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/media?parent=597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/categories?post=597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/tags?post=597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}