{"id":214,"date":"2018-09-29T07:53:34","date_gmt":"2018-09-29T07:53:34","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=214"},"modified":"2026-06-23T01:53:59","modified_gmt":"2026-06-23T01:53:59","slug":"egyszemelyes-felfuggesztett-dolgozo-platform-zlp100-tower-karbantartasi","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/hu\/single-person-suspended-working-platform-zlp100-tower-maintenance.html","title":{"rendered":"Single-person ZLP100 Suspended Working Platform for Building Maintenance"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Single-person ZLP100 Suspended Working Platform for Building Maintenance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Single-person ZLP100 Suspended Working Platform for Building Maintenance<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp100, 100 KG. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"640\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Single-Person-Suspended-Working-Platform-ZLP100-For-Tower-Maintenance.jpg\" alt=\"Egyszem\u00e9lyes felf\u00fcggesztett munka\u00e1llv\u00e1ny ZLP100 Torony karbantart\u00e1shoz\" class=\"wp-image-215\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Single-Person-Suspended-Working-Platform-ZLP100-For-Tower-Maintenance.jpg 640w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Single-Person-Suspended-Working-Platform-ZLP100-For-Tower-Maintenance-150x150.jpg 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Single-Person-Suspended-Working-Platform-ZLP100-For-Tower-Maintenance-300x300.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Single-Person-Suspended-Working-Platform-ZLP100-For-Tower-Maintenance-50x50.jpg 50w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Gyors r\u00e9szletek:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">1. T\u00edpussz\u00e1m: ZLP100<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. M\u00e1rka neve: SIKER<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Anyag: ac\u00e9l \/ alum\u00ednium<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Megjelen\u00e9s: ac\u00e9l \/ horganyzott \/ alum\u00ednium<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Kapacit\u00e1s felt\u00f6lt\u00e9s: 100 KG<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">6. Emel\u00e9si magass\u00e1g: 300 m<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">7. Ellens\u00faly: Beton, Beton ac\u00e9l burkolattal, Vas<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Alkalmaz\u00e1sok:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">1. A magas \u00e9p\u00fcletek k\u00fcls\u0151 fal\u00e1nak tiszt\u00edt\u00e1sa \u00e9s karbantart\u00e1sa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. K\u00fcls\u0151 falak fest\u00e9se, d\u00edsz\u00edt\u00e9se \u00e9s fel\u00faj\u00edt\u00e1sa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. A magas \u00e9p\u00fcletek k\u00fcls\u0151 falainak szerel\u00e9se \u00e9s egy\u00e9b \u00e9p\u00edt\u00e9si munk\u00e1i.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. A haj\u00f3, a nagy torony, a h\u00edd, a g\u00e1tak \u00e9s a nagy k\u00e9m\u00e9nyek l\u00e9giforgalmi munk\u00e1ja.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Telep\u00edt\u00e9s \u00e9s karbantart\u00e1s magas \u00e9p\u00fcletek felvon\u00f3 lift, haj\u00f3\u00e9p\u00edt\u0151 ipar, tengerj\u00e1r\u00f3 haj\u00f3, hadihaj\u00f3k hegeszt\u00e9s karbantart\u00e1s.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Technikai param\u00e9terek:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">T\u00f6lt\u00e9si kapacit\u00e1s: 100kg<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Emel\u00e9si sebess\u00e9g: 9,6 m \/ perc<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">M\u00e9ret: 1000 x 690 x 1300 mm (LXWXH)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Teljes\u00edtm\u00e9ny: 1 x 1,5 kW<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">F\u00e9knyomat\u00e9k: 15Nm<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ac\u00e9l k\u00f6t\u00e9lsz\u00f6g be\u00e1ll\u00edt\u00e1si tartom\u00e1ny (\u00b0): 3 \u00b0 - 8 \u00b0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A k\u00e9t ac\u00e9lk\u00f6t\u00e9l (mm) k\u00f6z\u00f6tti t\u00e1vols\u00e1g: \u2264100<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Els\u0151sug\u00e1rz\u00e1s (mm): 1500mm<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ellens\u00faly: 25kg x 30db<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ac\u00e9lk\u00f6tel \u00e1tm\u00e9r\u0151je (mm): 8,3 mm<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Maxim\u00e1lis emel\u00e9si magass\u00e1g (m): 300<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Motor forg\u00e1si sebess\u00e9ge (r \/ perc): 1420<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Fesz\u00fclts\u00e9g: 380V \/ 220V \/ 415V, 50HZ \/ 60HZ, egyf\u00e1zis\u00fa \/ h\u00e1rom f\u00e1zis<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Versenyel\u0151ny\u00f6k:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">1. Biztos\u00edtja az \u00e9letbiztons\u00e1got az antenn\u00e1s munkav\u00e9gz\u00e9s sor\u00e1n<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A biztons\u00e1gi z\u00e1r az ac\u00e9lk\u00f6telet azonnal r\u00f6gz\u00edtse, miut\u00e1n a felf\u00fcggesztett emel\u0151kos\u00e1r elfordul vagy az ac\u00e9lk\u00f6t\u00e9l kialszik az emel\u0151r\u00fadb\u00f3l. Az elektromos vez\u00e9rl\u0151 rendszert sziv\u00e1rg\u00e1sv\u00e9delemmel, t\u00falmeleged\u00e9ssel, t\u00falterhel\u00e9s elleni v\u00e9delemmel \u00e9s f\u00e9k\u00fctk\u00f6z\u0151kkel tervezt\u00e9k;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">J\u00f3 min\u0151s\u00e9g\u0171 ac\u00e9l dr\u00f3tk\u00f6t\u00e9l, biztons\u00e1gi k\u00f6t\u00e9l \u00e9s k\u00e1bel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Stabil teljes\u00edtm\u00e9ny: emelje fel \u00e9s lefel\u00e9 lefel\u00e9<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Modul\u00e1ris kialak\u00edt\u00e1s. K\u00f6nny\u0171 sz\u00e9tszerelni, \u00f6ssze\u00e1ll\u00edtani \u00e9s karbantartani.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Az emel\u00e9si magass\u00e1g az ig\u00e9nyeknek megfelel\u0151en \u00e1ll\u00edthat\u00f3 (legfeljebb 300 m\u00e9ter)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. \u00dczemi fesz\u00fclts\u00e9g \u00e9s frekvencia \u00e1ll\u00edthat\u00f3 (220V \/ 380V \/ 415V stb.)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">6. A speci\u00e1lis haszn\u00e1latra sz\u00e1nt felf\u00fcggesztett platform testreszabhat\u00f3 (k\u00f6r alak\u00fa, L alak\u00fa, U alak\u00fa, stb.)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">7. Professzion\u00e1lis min\u0151s\u00e9g, versenyk\u00e9pes \u00e1r, gyors sz\u00e1ll\u00edt\u00e1s, j\u00f3 szolg\u00e1ltat\u00e1sok.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">R\u00e9szletes term\u00e9kle\u00edr\u00e1s<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">Motor teljes\u00edtm\u00e9ny: 2 x 1,5 kW, 50\/60 Hz<br>\nAnyag: Ac\u00e9l \/ Alum\u00ednium\u00f6tv\u00f6zet<br>\nEmel\u00e9si sebess\u00e9g: 9,6 M \/ perc<br>\nAc\u00e9lk\u00f6t\u00e9l \u00e1tm\u00e9r\u0151je: 8,3 mm<br>\nMegjelen\u00e9s: ac\u00e9l \/ horganyzott \/ alum\u00ednium \u00f6tv\u00f6zet motor elforgat\u00e1sa<br>\nSebess\u00e9g: 1420 R \/ min<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/hu\/felfuggesztett-dolgozo-platform\/\">felf\u00fcggesztett munka\u00e1llv\u00e1ny<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/hu\/kategoria\/termekek\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/hu\/lepjen-kapcsolatba-velunk\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Single-person ZLP100 Suspended Working Platform for Building Maintenance. Review specifications, applications, configuration options and project information r<\/p>","protected":false},"author":1,"featured_media":215,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,3],"tags":[20,10,14,16,15],"class_list":["post-214","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-suspended-working-platform-manufacturer","tag-suspended-personnel-platform","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-suspended-wire-rope-platform","tag-temporary-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/comments?post=214"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/214\/revisions"}],"predecessor-version":[{"id":1421,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/posts\/214\/revisions\/1421"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/media\/215"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/media?parent=214"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/categories?post=214"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/hu\/wp-json\/wp\/v2\/tags?post=214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}