ZLP630 Platform Material Options for Facade Painting
ZLP630 Platform Material Options for Facade Painting is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp630, 630kg. These values should be confirmed against the final supplied configuration and destination power supply.

Acero Pintado / Caliente Galvanizado / Aluminio ZLP630 Plataforma de Trabajo Suspendida Para Construir Pintura De Fachada
Limpeza de fiestras eléctricas A plataforma de traballo suspendida úsase principalmente nos seguintes aspectos:
1. Mantemento exterior e limpeza de edificios altos,
2. Inspección de construción e mantemento de tanques de grandes dimensións, chemineas, presas, pontes e derricks.
3, soldeo, limpeza e pintura de gran tamaño.
Ficha Técnica para Plataforma suspendida ZLP630:
| modelo | zlp630 |
| carga nominal | 630 kg |
| Nº de plataforma | 3 seccións |
| velocidade de elevación | 9,6 m / min |
| Tamaño da plataforma | (2000 x 3) x 690 x 1300 mm |
| mecanismo de suspensión | 2 x 175 kg |
| potencia do motor | 2 x 1,5 kw |
| Voltaxe | 380V / 220V / 415V / 440V, 50HZ / 60HZ, 3 Fase |
| material | aceiro ou aluminio |
| Peso do contador | 900 kg; só cemento; tapa de aceiro + cemento; ferro fundido; |
Observacións:
1.SUCCESS tamén pode fabricar ZLP250, ZLP500, ZLP800, ZLP1000 plataforma suspendida.
2. Temos tamén o servizo de OEM e ODM.
3. Horas de servizo: 24 horas * 365 días.



Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our plataforma de traballo suspendida, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
