{"id":225,"date":"2018-09-29T08:03:48","date_gmt":"2018-09-29T08:03:48","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=225"},"modified":"2026-06-23T01:53:56","modified_gmt":"2026-06-23T01:53:56","slug":"masta-eskalada-esekita-lan-plataforma-mobile-altxatutako-lan-plataforma","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/eu\/mast-climbing-suspended-working-platform-mobile-elevated-work-platform.html","title":{"rendered":"Mast Climbing and Mobile Elevated Work Platform"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Mast Climbing and Mobile Elevated Work Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Mast Climbing and Mobile Elevated Work Platform<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The final platform length, rated load, electrical supply and suspension arrangement should be confirmed for the actual project.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"700\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform.jpg\" alt=\"Mast Eskorga Lan Plataforma Iraunkorra \/ Plataforma Mugikorreko Lan Altua\" class=\"wp-image-226\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform.jpg 700w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform-150x150.jpg 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform-300x300.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Mast-Climbing-Suspended-Working-Platform-mobile-elevated-work-platform-50x50.jpg 50w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mast Eskorga Lan Plataforma Iraunkorra \/ Plataforma Mugikorreko Lan Altua<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">deskribapenak<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">aplikazioak:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Goi-mailako eraikinaren kanpoko horma garbitu eta mantentzea.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Kanpoaldeko hormako pintura, apainketa eta zaharberritzea.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Instalazio-proiektuak eta goi-mailako eraikinaren kanpoko hormak eraikitzeko beste eraikuntza batzuk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Itsasontzia, dorrea, zubia, presak eta tximini handiak aireko lanean.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Instalatu eta mantendu goi-mailako eraikineko igogailu hoistway, itsasontzien industria, ontzi itsasontziz, ontzi soldadura mantentzeko.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Parametro teknikoak<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Jabetza Modeloaren zenbakia.<\/td><td>ZLP500<\/td><\/tr><tr><td colspan=\"2\">Karga nominala (kg)<\/td><td>500<\/td><\/tr><tr><td colspan=\"2\">Igogailua abiadura (m \/ min)<\/td><td>9 ~ 11<\/td><\/tr><tr><td colspan=\"2\">Motorearen potentzia (kw)<\/td><td>2 \u00d7 1.5 50HZ \/ 60HZ<\/td><\/tr><tr><td colspan=\"2\">Brake momentua (Km)<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Soka koroa angeluaren egokitze-tartea (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Sokaren bi sokaren arteko distantzia (mm)<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Beheko tarte motaren arabera (mm)<\/td><td>1500<\/td><\/tr><tr><td rowspan=\"5\">Plataforma etetea<\/td><td>blokeatzea<\/td><td>Aluminiozko aleazioa<\/td><\/tr><tr><td>Nr. Plataforma plataforma<\/td><td>Banako rack<\/td><\/tr><tr><td>Nr.Of plataforma<\/td><td>2<\/td><\/tr><tr><td>L \u00d7 W \u00d7 H (mm)<\/td><td>(2500 \u00d7 2) \u00d7 690 \u00d7 1300<\/td><\/tr><tr><td>Pisua (kg)<\/td><td>375 Kg<\/td><\/tr><tr><td colspan=\"2\">Mekanismoa etetea (kg)<\/td><td>2 \u00d7 175 Kg<\/td><\/tr><tr><td colspan=\"2\">Counterweight (kg) aukerakoa<\/td><td>25 \u00d7 30pcs<\/td><\/tr><tr><td colspan=\"2\">Altzairu soken diametroa (mm)<\/td><td>8.3<\/td><\/tr><tr><td colspan=\"2\">Gehienezko altuera altxatzea (m)<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Motorearen biraketa abiadura (r \/ min)<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Tentsioa (v) 3FASEA \/ Fase bakarra<\/td><td>220V \/ 380V \/ 415V, 50 \/ 60Hz<p><\/p>\n<p>(Pertsonalizatuak)<\/p><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/eu\/esekita-lan-plataforma\/\">lan-plataforma eten egin da<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/eu\/kategoria\/produktu\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/eu\/jarri-gurekin-harremanetan\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Mast Climbing and Mobile Elevated Work Platform. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":226,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,3],"tags":[10,14,15],"class_list":["post-225","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-suspended-working-platform-manufacturer","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-temporary-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/posts\/225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/comments?post=225"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/posts\/225\/revisions"}],"predecessor-version":[{"id":1418,"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/posts\/225\/revisions\/1418"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/media\/226"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/media?parent=225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/categories?post=225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/eu\/wp-json\/wp\/v2\/tags?post=225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}