{"id":643,"date":"2018-10-16T06:27:17","date_gmt":"2018-10-16T06:27:17","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=643"},"modified":"2026-06-23T01:52:28","modified_gmt":"2026-06-23T01:52:28","slug":"seil-hangend-hangend-zugang-plattform-zlp630-bau-aufzug-gondel-maschine-2","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/de\/seilaufhangung-schwebende-arbeitsbuhne-zlp630-bauaufzug-gondelbahn-2-html","title":{"rendered":"ZLP630 Rope-Hanging Suspended Access Platform"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ZLP630 Rope-Hanging Suspended Access Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>ZLP630 Rope-Hanging Suspended Access Platform<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp630. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"700\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/suspended-wire-rope-platform-window-cleaning-equipment-4-1.jpg\" alt=\"ZLP630 Rope-Hanging Suspended Access Platform\" class=\"wp-image-654\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/suspended-wire-rope-platform-window-cleaning-equipment-4-1.jpg 700w, https:\/\/www.sewbc.com\/wp-content\/uploads\/suspended-wire-rope-platform-window-cleaning-equipment-4-1-150x150.jpg 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/suspended-wire-rope-platform-window-cleaning-equipment-4-1-300x300.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/suspended-wire-rope-platform-window-cleaning-equipment-4-1-50x50.jpg 50w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Schnelle Details<\/strong><br>\nUrsprungsort: Shanghai, China (Festland)<br>\nMarkenname: ERFOLGE<br>\nModellnummer: ZLP<br>\nFahrweise: Elektrische Energie<br>\nMaterial: Aluminium<br>\nPlattform-Montage: Schraubentyp<br>\nZertifizierung: ISO9001: 2008 \/ CE \/ T\u00dcV<br>\nPlattformaufh\u00e4ngung: Endb\u00fcgel<br>\nVerankerungsoptionen: Ausleger<br>\nFarbe: Angepasst<br>\nName: ERFOLGS-Maschine<br>\nAnwendung: H\u00e4ngende Ger\u00fcstplattform<br>\nTyp: ZLP<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Versorgungsf\u00e4higkeit<\/strong><br>\nVersorgungs-F\u00e4higkeit: 800 Satz \/ S\u00e4tze pro Monat f\u00fcr Bauaufzug<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Verpackung &amp; Lieferung<\/strong><br>\nVerpackungsdetails: Karton + Sperrholz Palette + Sperrholz Fall<br>\nHafen: Shanghai<br>\nVorlaufzeit: Lieferung innerhalb von 20 Tagen nach Zahlungseingang<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"640\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/aerial-work-platform-high-rise-window-cleaning-3.jpg\" alt=\"ZLP630 Rope-Hanging Suspended Access Platform - image 2\" class=\"wp-image-655\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/aerial-work-platform-high-rise-window-cleaning-3.jpg 640w, https:\/\/www.sewbc.com\/wp-content\/uploads\/aerial-work-platform-high-rise-window-cleaning-3-150x150.jpg 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/aerial-work-platform-high-rise-window-cleaning-3-300x300.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/aerial-work-platform-high-rise-window-cleaning-3-50x50.jpg 50w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"5\"><strong data-spm-anchor-id=\"a2700.details.pronpeci14.i1.341777c6fxDA4t\">Die Parameter der ZLP-Serie ausgesetzt Plattform<\/strong><\/td><\/tr><tr><td>Tpye<\/td><td>ZLP500<\/td><td><em><strong>ZLP630<\/strong><\/em><\/td><td>ZLP800<\/td><td>ZLP1000<\/td><\/tr><tr><td>Nennlast<\/td><td>500 kg<\/td><td><em><strong>630kg<\/strong><\/em><\/td><td>800 kg<\/td><td>1000 kg<\/td><\/tr><tr><td>Hubgeschwindigkeit<\/td><td>9 m \/ min<\/td><td><em><strong>9 m \/ min<\/strong><\/em><\/td><td>9 m \/ min<\/td><td>8,7 m \/ min<\/td><\/tr><tr><td>Spannung-3-phase<\/td><td>380 V (415 V \/ 220 V)<\/td><td><em><strong>380 V (415 V \/ 220 V)<\/strong><\/em><\/td><td>380 V (415 V \/ 220 V)<\/td><td>380 V (415 V \/ 220 V)<\/td><\/tr><tr><td>Frequenz<\/td><td>50 Hz \/ 60 Hz<\/td><td><em><strong>50 Hz \/ 60 Hz<\/strong><\/em><\/td><td>50 Hz \/ 60 Hz<\/td><td>50 Hz \/ 60 Hz<\/td><\/tr><tr><td>Leistung<\/td><td>1,1 \u00d7 2<\/td><td><em><strong>1,5 \u00d7 2<\/strong><\/em><\/td><td>1,8 \u00d7 2<\/td><td>2,0 \u00d7 2<\/td><\/tr><tr><td>Hissen<\/td><td>LTD50<\/td><td><em><strong>LTD63<\/strong><\/em><\/td><td>LTD80<\/td><td>LTD100<\/td><\/tr><tr><td>Sicherheitsschloss<\/td><td>LSF308<\/td><td><em><strong>LSF308<\/strong><\/em><\/td><td>LSF309<\/td><td>LSF310<\/td><\/tr><tr><td>Dia.von Drahtseil<\/td><td>4 \u00d7 31SW + FC-8,3 mm<\/td><td><em><strong>4 \u00d7 31SW + FC-8,3 mm<\/strong><\/em><\/td><td>4 \u00d7 31SW + FC-9.1mm<\/td><td>4 \u00d7 31SW + FC-10,2 mm<\/td><\/tr><tr><td>Plateform Size &nbsp;(L\u00d7W\u00d7H)<\/td><td>(2,5 \u00d7 2) \u00d7 0,76 \u00d7 1,45 M<\/td><td><em><strong>(2 \u00d7 3) \u00d7 0,76 \u00d7 1,45 M<\/strong><\/em><\/td><td>(2,5 \u00d7 3) \u00d7 0,76 \u00d7 1,45 M<\/td><td>(2,5 \u00d7 3) \u00d7 0,76 \u00d7 1,45 M<\/td><\/tr><tr><td>Gewicht der abgeh\u00e4ngten Jibs<\/td><td>340kg<\/td><td><em><strong>340kg<\/strong><\/em><\/td><td>340kg<\/td><td>340kg<\/td><\/tr><tr><td>Gewicht des anhebenden Teils<\/td><td>410kg (Stahl)<br>\n290kg (Aluminium)<\/td><td><em><strong>450kg (Stahl)<\/strong><\/em><br>\n<em><strong>310kg (Aluminium)<\/strong><\/em><\/td><td>520kg (Stahl)<br>\n340kg (Aluminium)<\/td><td>520kg (Stahl)<br>\n340kg (Aluminium)<\/td><\/tr><tr><td>Gegengewicht<\/td><td>800kgs<\/td><td><em><strong>900kgs<\/strong><\/em><\/td><td>1000kgs<\/td><td>1200kgs<\/td><\/tr><tr><td>20GP Menge des Pakets<\/td><td>10 S\u00e4tze<\/td><td><em><strong>10 S\u00e4tze<\/strong><\/em><\/td><td>9 S\u00e4tze<\/td><td>9 S\u00e4tze<\/td><\/tr><tr><td colspan=\"5\"><em><strong>* Das Gewicht des anhebenden Teils schlie\u00dft Plattform, Hebemaschine, Sicherheitsschl\u00f6sser und elektrisches Kontrollsystem mit ein.<\/strong><\/em><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Gondelmaschine Details<\/strong><br>\nVervollkommnen Sie die Details des Prozesses und Qualit\u00e4t ist die Garantie<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"929\" height=\"759\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/TIM\u622a\u56fe20181016142519.png\" alt=\"ZLP630 Rope-Hanging Suspended Access Platform - image 3\" class=\"wp-image-658\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/TIM\u622a\u56fe20181016142519.png 929w, https:\/\/www.sewbc.com\/wp-content\/uploads\/TIM\u622a\u56fe20181016142519-300x245.png 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/TIM\u622a\u56fe20181016142519-768x627.png 768w\" sizes=\"auto, (max-width: 929px) 100vw, 929px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"468\" height=\"950\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/HTB1PzC4JVXXXXXWXXXXq6xXFXXXq.jpg\" alt=\"ZLP630 Rope-Hanging Suspended Access Platform - image 4\" class=\"wp-image-659\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/HTB1PzC4JVXXXXXWXXXXq6xXFXXXq.jpg 468w, https:\/\/www.sewbc.com\/wp-content\/uploads\/HTB1PzC4JVXXXXXWXXXXq6xXFXXXq-148x300.jpg 148w\" sizes=\"auto, (max-width: 468px) 100vw, 468px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Zubeh\u00f6r f\u00fcr abgeh\u00e4ngte Plattform<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"750\" height=\"684\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/HTB1PKr7JVXXXXcrXpXXq6xXFXXXB.jpg\" alt=\"ZLP630 Rope-Hanging Suspended Access Platform - image 5\" class=\"wp-image-660\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/HTB1PKr7JVXXXXcrXpXXq6xXFXXXB.jpg 750w, https:\/\/www.sewbc.com\/wp-content\/uploads\/HTB1PKr7JVXXXXcrXpXXq6xXFXXXB-300x274.jpg 300w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/de\/hubarbeitsbuhnen\/\">Hubarbeitsb\u00fchnen<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/de\/kategorie\/produkte\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/de\/kontaktiere-uns\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>ZLP630 Rope-Hanging Suspended Access Platform. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":654,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[18,10,15,17,19],"class_list":["post-643","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspended-access-platforms-manufacturer","tag-suspended-platform-gondola","tag-suspended-platform-hoist","tag-temporary-suspended-platform","tag-zlp-630-suspended-platform","tag-zlp-800-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/posts\/643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/comments?post=643"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/posts\/643\/revisions"}],"predecessor-version":[{"id":1344,"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/posts\/643\/revisions\/1344"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/media\/654"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/media?parent=643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/categories?post=643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/de\/wp-json\/wp\/v2\/tags?post=643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}