{"id":543,"date":"2018-10-12T07:11:59","date_gmt":"2018-10-12T07:11:59","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=543"},"modified":"2026-06-23T01:52:58","modified_gmt":"2026-06-23T01:52:58","slug":"uchel-godi-adeiladu-cryf-atal-gweithio-llwyfannau-zlp500-2m2-1-5kw-6-3kn","status":"publish","type":"post","link":"http:\/\/www.sewbc.com\/cy\/llwyfannau-gweithio-ataliedig-cryf-adeilad-uchel-zlp500-2m2-1-5kw-6-3kn-html","title":{"rendered":"2m 1.5kW ZLP500 Suspended Working Platform"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">2m 1.5kW ZLP500 Suspended Working Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>2m 1.5kW ZLP500 Suspended Working Platform<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp500, 2m, 1.5kw, 8.3MM. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><figure><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-424\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Manual-electric-hoisting-basket-for-construction-projects.jpg\" alt=\"Prosiectau llaw-trydan-cwympo-basged-ar-gyfer-adeiladu\" width=\"700\" height=\"700\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Manual-electric-hoisting-basket-for-construction-projects.jpg 700w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Manual-electric-hoisting-basket-for-construction-projects-150x150.jpg 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Manual-electric-hoisting-basket-for-construction-projects-300x300.jpg 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Manual-electric-hoisting-basket-for-construction-projects-50x50.jpg 50w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/figure><\/h3>\n\n\n\n<h3 class=\"wp-block-heading\">ZLP500 2M * 2, 1.5KW 6.3KN Llwyfan Gweithio Nerth Strong Gyda Diamedr 8.3MM Wire Dur<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Ein ffatri:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">LLWYDDIANT. wedi&#039;i sefydlu yn 2005. Mae&#039;n fenter uwch-dechnoleg blaenllaw sy&#039;n arbenigo mewn ymchwil, datblygu a gwneuthurwr trydanol wedi&#039;i atal<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Llwyfan, codi arian a gwahanol fathau eraill o offer adeiladu. Mae ein cynnyrch gydag ansawdd proffesiynol, pris cystadleuol a chyflenwi cyflym. Gallwn ni eu haddasu yn \u00f4l eich gofynion.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Ceisiadau:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">1. Glanhau a chynnal wal allanol adeilad uchel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Peintio, addurno ac ailwampio waliau allanol.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Prosiectau gosod a gwaith adeiladu eraill o waliau allanol adeilad uchel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Gweithio awyr o long, twr mawr, pont, argaeau a simneiau mawr.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Gosod a chynnal a chadw ar gyfer codi lifft adeilad uchel, diwydiant adeiladu llongau, cwch ymosod, cynnal weldio rhyfeloedd.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Manylebau<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Model Eiddo Rhif<\/td><td>ZLP500<\/td><\/tr><tr><td colspan=\"2\">Llwyth wedi&#039;i raddio (kg)<\/td><td>500<\/td><\/tr><tr><td colspan=\"2\">Cyflymder codi (m \/ min)<\/td><td>9 ~ 11<\/td><\/tr><tr><td colspan=\"2\">P\u0175er modur (kw)<\/td><td>2 \u00d7 1.5 50HZ \/ 60HZ<\/td><\/tr><tr><td colspan=\"2\">Torc Brake (Km)<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Amrediad addasiad ongl rhaff ddur (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Pellter rhwng dwy rhaff ddur (mm)<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Darn wedi&#039;i osod o ddarn blaen (mm)<\/td><td>1500<\/td><\/tr><tr><td>Llwyfan tanio<\/td><td>Cloi<\/td><td>Aloi alwminiwm<\/td><\/tr><tr><td><\/td><td>Nr.Or rac platfform<\/td><td>Rac sengl<\/td><\/tr><tr><td><\/td><td>Nr.Of platform<\/td><td>2<\/td><\/tr><tr><td><\/td><td>L \u00d7 W \u00d7 H (mm)<\/td><td>(2000 \u00d7 2) \u00d7 690 \u00d7 1180<\/td><\/tr><tr><td><\/td><td>Pwysau (kg)<\/td><td>375 Kg<\/td><\/tr><tr><td colspan=\"2\">Mecanwaith atal (kg)<\/td><td>2 \u00d7 175 Kg<\/td><\/tr><tr><td colspan=\"2\">Gwrth-bwysau (kg) dewisol<\/td><td>25 \u00d7 30pcs<\/td><\/tr><tr><td colspan=\"2\">Diamedr y rhaff dur (mm)<\/td><td>8.3<\/td><\/tr><tr><td colspan=\"2\">Uchder codi uchder (m)<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Cyflymder cylchdroi modur (r \/ min)<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Voltedd (v) 3 PHASAU<\/td><td>220V \/ 380V \/ 415V<p><\/p>\n<p>(wedi&#039;i addasu)<\/p><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Prif Gyfansoddion:<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"500\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Components-and-Projects-1.jpg\" alt=\"2m 1.5kW ZLP500 Suspended Working Platform - image 2\" class=\"wp-image-544\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Components-and-Projects-1.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Components-and-Projects-1-300x250.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pecyn Cynhwysydd:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Container-Packing12.jpg\" alt=\"2m 1.5kW ZLP500 Suspended Working Platform - image 3\" class=\"wp-image-545\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Container-Packing12.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Container-Packing12-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"377\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Container-Packing13.jpg\" alt=\"2m 1.5kW ZLP500 Suspended Working Platform - image 4\" class=\"wp-image-546\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Container-Packing13.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Container-Packing13-300x189.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/cy\/croes-weithio-llwyfan\/\">llwyfan gweithio gwaharddedig<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/cy\/categori\/cynhyrchion\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/cy\/cysylltwch-a-ni\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>2m 1.5kW ZLP500 Suspended Working Platform. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":424,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,3],"tags":[10,14,15],"class_list":["post-543","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-suspended-working-platform-manufacturer","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-temporary-suspended-platform"],"_links":{"self":[{"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/543","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/comments?post=543"}],"version-history":[{"count":3,"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/543\/revisions"}],"predecessor-version":[{"id":1369,"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/543\/revisions\/1369"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/media\/424"}],"wp:attachment":[{"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/media?parent=543"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/categories?post=543"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/tags?post=543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}