{"id":258,"date":"2018-10-07T02:41:17","date_gmt":"2018-10-07T02:41:17","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=258"},"modified":"2026-06-23T01:53:48","modified_gmt":"2026-06-23T01:53:48","slug":"paentio-alwminiwm-crog-gwifren-rhaff-platfform-500kg-630kg-800kg-1000kg","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/cy\/painted-aluminum-suspended-wire-rope-platform-500kg-630kg-800kg-1000kg.html","title":{"rendered":"Aluminum 500kg Rope Suspended Platform"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Aluminum 500kg Rope Suspended Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Aluminum 500kg Rope Suspended Platform<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references 500kg, 630kg, 800kg, 1000kg, 380V, 220V, 415V, 1.5kw. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"780\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1.png\" alt=\"Aluminum 500kg Rope Suspended Platform\" class=\"wp-image-259\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1.png 780w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-150x150.png 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-300x300.png 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-768x768.png 768w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-1-50x50.png 50w\" sizes=\"auto, (max-width: 780px) 100vw, 780px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Disgrifiad Manwl o&#039;r Cynnyrch<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Deunydd: Alloy Dur \/ Alwminiwm<br>\nLliwiau: Coch, Melyn, Oren, Du, Arian (wedi&#039;i addasu)<br>\nLlwyth Graddio: 500kg, 630kg, 800kg, 1000kg<br>\nP\u0175er Modur: 1.5kw, 1.8kw, 2.2kw<br>\nCyflymder Rotation Modur: 1420r \/ min<br>\nVoltage: Single Phase \/ Three Phases (380V\/220V\/415V&#8230;)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Platform Rope Wire Ataliedig Alwminiwm Paentiedig 500kg \/ 630kg \/ 800kg \/ 1000kg<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Sicrhau diogelwch bywyd bywyd yn ystod yr Awyr yn gweithio<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mae cloi diogelwch yn cau&#039;r rhaff dur yn syth unwaith y bydd y llwyfan ar y llwyfan wedi&#039;i atal neu y rhaff dur yn llithro allan o&#039;r codiad; Cynllun rheoli trydan wedi&#039;i ddylunio gyda gwarchod rhag gollwng, gwarchod rhag gwres, amddiffyn gorlwythiad presennol a stopio br\u00eac;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rhaff gwifren dur o ansawdd da, rhaff diogelwch a chebl.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Perfformiad sefydlog: codi a gostwng yn esmwyth<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Dylunio modiwlaidd. Hawdd i&#039;w dadelfennu, cydosod gweithredu a chynnal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Gellir addasu uchder codi yn \u014dl y gofyniad (Uchafswm 300 Metr)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Gellir addasu foltedd ac amlder gweithio (220V \/ 380V \/ 415V ac ati)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">6. Gellir addasu llwyfan wedi&#039;i atal ar gyfer defnydd arbennig (cylchlythyr, si\u00e2p L, si\u00e2p U, ac ati)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">7. Ansawdd proffesiynol, pris cystadleuol, cyflenwi cyflym, gwasanaethau da.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Ceisiadau:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.Cleanio a chynnal wal allanol adeilad uchel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Paentio, addurno ac ailwampio waliau allanol.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Prosiectau gosod a gwaith adeiladu eraill o waliau allanol adeilad uchel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Gweithio awyr o long, twr mawr, pont, argaeau a simneiau mawr.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Gosod a chynnal a chadw ar gyfer codi lifft adeilad uchel, diwydiant adeiladu llongau, cwch ymosod, cynnal weldio rhyfeloedd.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Paramedrau Technegol:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Model Eiddo Rhif<\/td><td>ZLP500<\/td><td>ZLP630<\/td><td>ZLP800<\/td><td>ZLP1000<\/td><\/tr><tr><td colspan=\"2\">Llwyth wedi&#039;i raddio (kg)<\/td><td>500<\/td><td>630<\/td><td>800<\/td><td>1000<\/td><\/tr><tr><td colspan=\"2\">Cyflymder codi (m \/ min)<\/td><td>9 ~ 11<\/td><td>9 ~ 11<\/td><td>8 ~ 10<\/td><td>8~10<\/td><\/tr><tr><td colspan=\"2\">P\u0175er modur (kw)<\/td><td>2 \u00d7 1.5 50HZ \/ 60HZ<\/td><td>2 \u00d7 1.5 50HZ \/ 60HZ<\/td><td>2 \u00d7 1.8 50HZ \/ 60HZ<\/td><td>2 \u00d7 2.2<br>\n50HZ \/ 60HZ<\/td><\/tr><tr><td colspan=\"2\">Torc Brake (Km)<\/td><td>16<\/td><td>16<\/td><td>16<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Amrediad addasiad ongl rhaff ddur (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><td>3 \u00b0 - 8 \u00b0<\/td><td>3 \u00b0 - 8 \u00b0<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Pellter rhwng dwy rhaff ddur (mm)<\/td><td>\u2264100<\/td><td>\u2264100<\/td><td>\u2264100<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Darn wedi&#039;i osod o ddarn blaen (mm)<\/td><td>1500<\/td><td>1500<\/td><td>1500<\/td><td>1500<\/td><\/tr><tr><td>Llwyfan tanio<\/td><td>Cloi<\/td><td>Aloi alwminiwm<\/td><td>Aloi alwminiwm<\/td><td>Aloi alwminiwm<\/td><td>Aloi alwminiwm<\/td><\/tr><tr><td><\/td><td>Nr.Or rac platfform<\/td><td>Rac sengl<\/td><td>Rac sengl<\/td><td>Rac sengl<\/td><td>Rac sengl<\/td><\/tr><tr><td><\/td><td>Nr.Of platform<\/td><td>2<\/td><td>3<\/td><td>3<\/td><td>3<\/td><\/tr><tr><td><\/td><td>L \u00d7 W \u00d7 H (mm)<\/td><td>(2000 \u00d7 2) \u00d7 690 \u00d7 1300<\/td><td>(2000 \u00d7 3) \u00d7 690 \u00d7 1300<\/td><td>(2500 \u00d7 3) \u00d7 690 \u00d7 1300<\/td><td>(2500 \u00d7 3) \u00d7 690 \u00d7 1300<\/td><\/tr><tr><td><\/td><td>Pwysau (kg)<\/td><td>350 Kg<\/td><td>375 Kg<\/td><td>410 Kg<\/td><td>455kg<\/td><\/tr><tr><td colspan=\"2\">Mecanwaith atal (kg)<\/td><td>2 \u00d7 175 Kg<\/td><td>2 \u00d7 175 Kg<\/td><td>2 \u00d7 175 Kg<\/td><td>2 \u00d7 175 Kg<\/td><\/tr><tr><td colspan=\"2\">Gwrth-bwysau (kg) dewisol<\/td><td>25 \u00d7 30pcs<\/td><td>25 \u00d7 36pcs<\/td><td>25 \u00d7 40pcs<\/td><td>25 \u00d7 44pcs<\/td><\/tr><tr><td colspan=\"2\">Diamedr y rhaff dur (mm)<\/td><td>8.3<\/td><td>8.3<\/td><td>8.6<\/td><td>8.6<\/td><\/tr><tr><td colspan=\"2\">Uchder codi uchder (m)<\/td><td>300<\/td><td>300<\/td><td>300<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Cyflymder cylchdroi modur (r \/ min)<\/td><td>1420<\/td><td>1420<\/td><td>1420<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Voltedd (v) Cyfnod Sengl \/ 3 Phhas<\/td><td>220V \/ 380V \/<br>\n415V<\/td><td>220V \/ 380V \/<br>\n415V<\/td><td>220V \/ 380V \/<br>\n415V<\/td><td>220V \/ 380V \/<br>\n415V<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Prif rannau:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"500\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150108100701_67370.jpg\" alt=\"Aluminum 500kg Rope Suspended Platform - image 2\" class=\"wp-image-260\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150108100701_67370.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20150108100701_67370-300x250.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/cy\/llwyfan-crog-lwyfan\/\">llwyfan wedi&#039;i atal dros dro<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/cy\/categori\/cynhyrchion\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/cy\/cysylltwch-a-ni\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Aluminum 500kg Rope Suspended Platform. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":259,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,4],"tags":[10,16,15,17,19],"class_list":["post-258","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-rope-suspended-platform-manufacturer","tag-suspended-platform-hoist","tag-suspended-wire-rope-platform","tag-temporary-suspended-platform","tag-zlp-630-suspended-platform","tag-zlp-800-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/comments?post=258"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/258\/revisions"}],"predecessor-version":[{"id":1411,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/258\/revisions\/1411"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/media\/259"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/media?parent=258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/categories?post=258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/tags?post=258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}