{"id":253,"date":"2018-10-07T02:36:37","date_gmt":"2018-10-07T02:36:37","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=253"},"modified":"2026-06-23T01:53:49","modified_gmt":"2026-06-23T01:53:49","slug":"7-5m-dros-dro-atal-gwifren-rhaff-llwyfan-adeiladu","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/cy\/7-5m-temporarily-suspended-wire-rope-platform-construction.html","title":{"rendered":"7.5m Rope Suspended Platform for Construction"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">7.5m Rope Suspended Platform for Construction<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>7.5m Rope Suspended Platform for Construction<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references 7.5m. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-254\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-2.png\" alt=\"7.5m Rope Suspended Platform for Construction\" width=\"675\" height=\"675\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-2.png 675w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-2-150x150.png 150w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-2-300x300.png 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/ZLP800-Steel-Suspended-Scaffold-Work-Platform-2-50x50.png 50w\" sizes=\"auto, (max-width: 675px) 100vw, 675px\" \/><strong><strong>Platfform Rh\u00f4p Wire Di-dor 7.5M ar gyfer Adeiladu<\/strong><\/strong>Disgrifiad:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ceisiadau:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.Cleanio a chynnal wal allanol adeilad uchel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Paentio, addurno ac ailwampio waliau allanol.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Prosiectau gosod a gwaith adeiladu eraill o waliau allanol adeilad uchel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Gweithio awyr o long, twr mawr, pont, argaeau a simneiau mawr.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Gosod a chynnal a chadw ar gyfer codi lifft adeilad uchel, diwydiant adeiladu llongau, cwch ymosod, cynnal weldio rhyfeloedd.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manteision cystadleuol:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Sicrhau diogelwch bywyd bywyd yn ystod yr Awyr yn gweithio<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mae cloi diogelwch yn cau&#039;r rhaff dur yn syth unwaith y bydd y llwyfan ar y llwyfan wedi&#039;i atal neu y rhaff dur yn llithro allan o&#039;r codiad; Cynllun rheoli trydan wedi&#039;i ddylunio gyda gwarchod rhag gollwng, gwarchod rhag gwres, amddiffyn gorlwythiad presennol a stopio br\u00eac;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rhaff gwifren dur o ansawdd da, rhaff diogelwch a chebl.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Perfformiad sefydlog: codi a gostwng yn esmwyth<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Dylunio modiwlaidd. Hawdd i&#039;w dadelfennu, cydosod gweithredu a chynnal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Gellir addasu uchder codi yn \u014dl y gofyniad (Uchafswm 300 Metr)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Gellir addasu foltedd ac amlder gweithio (220V \/ 380V \/ 415V ac ati)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">6. Gellir addasu llwyfan wedi&#039;i atal ar gyfer defnydd arbennig (cylchlythyr, si\u00e2p L, si\u00e2p U, ac ati)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">7. Ansawdd proffesiynol, pris cystadleuol, cyflenwi cyflym, gwasanaethau da.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"680\" height=\"418\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145251_56430.jpg\" alt=\"7.5m Rope Suspended Platform for Construction - image 2\" class=\"wp-image-255\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145251_56430.jpg 680w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145251_56430-300x184.jpg 300w\" sizes=\"auto, (max-width: 680px) 100vw, 680px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"680\" height=\"320\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145440_76827.jpg\" alt=\"7.5m Rope Suspended Platform for Construction - image 3\" class=\"wp-image-256\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145440_76827.jpg 680w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145440_76827-300x141.jpg 300w\" sizes=\"auto, (max-width: 680px) 100vw, 680px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"680\" height=\"320\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145440_76827.jpg\" alt=\"7.5m Rope Suspended Platform for Construction - image 4\" class=\"wp-image-256\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145440_76827.jpg 680w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20150130145440_76827-300x141.jpg 300w\" sizes=\"auto, (max-width: 680px) 100vw, 680px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/cy\/llwyfan-crog-lwyfan\/\">llwyfan wedi&#039;i atal dros dro<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/cy\/categori\/cynhyrchion\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/cy\/cysylltwch-a-ni\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>7.5m Rope Suspended Platform for Construction. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":254,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,4],"tags":[10,14,16,15,19],"class_list":["post-253","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-rope-suspended-platform-manufacturer","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-suspended-wire-rope-platform","tag-temporary-suspended-platform","tag-zlp-800-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/253","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/comments?post=253"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/253\/revisions"}],"predecessor-version":[{"id":1412,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/253\/revisions\/1412"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/media\/254"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/media?parent=253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/categories?post=253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/tags?post=253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}