{"id":204,"date":"2018-10-07T02:26:34","date_gmt":"2018-10-07T02:26:34","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=204"},"modified":"2026-06-23T01:53:51","modified_gmt":"2026-06-23T01:53:51","slug":"uchel-ddiogelwch-rhaff-atal-platfform-lifting-height-300m-painting","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/cy\/high-safety-rope-suspended-platform-lifting-height-300m-painting.html","title":{"rendered":"300m Rope Suspended Platform for Facade Painting"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">300m Rope Suspended Platform for Facade Painting<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>300m Rope Suspended Platform for Facade Painting<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references 300m. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1067\" height=\"515\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/zlp1000.png\" alt=\"300m Rope Suspended Platform for Facade Painting\" class=\"wp-image-243\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/zlp1000.png 1067w, https:\/\/www.sewbc.com\/wp-content\/uploads\/zlp1000-300x145.png 300w, https:\/\/www.sewbc.com\/wp-content\/uploads\/zlp1000-768x371.png 768w, https:\/\/www.sewbc.com\/wp-content\/uploads\/zlp1000-1024x494.png 1024w\" sizes=\"auto, (max-width: 1067px) 100vw, 1067px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Uchafswm codi uchder 300M ar gyfer Peintio<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Disgrifiadau:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ceisiadau:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Glanhau a chynnal wal allanol adeilad uchel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Peintio, addurno ac ailwampio waliau allanol.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Prosiectau gosod a gwaith adeiladu eraill o waliau allanol adeilad uchel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Gweithio awyr o long, twr mawr, pont, argaeau a simneiau mawr.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Gosod a chynnal a chadw ar gyfer codi lifft adeilad uchel, diwydiant adeiladu llongau, cwch ymosod, cynnal weldio rhyfeloedd.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"617\" height=\"530\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150319110642_71338.jpg\" alt=\"300m Rope Suspended Platform for Facade Painting - image 2\" class=\"wp-image-246\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/20150319110642_71338.jpg 617w, https:\/\/www.sewbc.com\/wp-content\/uploads\/20150319110642_71338-300x258.jpg 300w\" sizes=\"auto, (max-width: 617px) 100vw, 617px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Paramedrau Technegol<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Model Rhif<\/td><td>ZLP1000<\/td><\/tr><tr><td colspan=\"2\">Llwyth wedi&#039;i raddio (kg)<\/td><td>1000<\/td><\/tr><tr><td colspan=\"2\">Cyflymder codi (m \/ min)<\/td><td>8 ~ 10<\/td><\/tr><tr><td colspan=\"2\">P\u0175er modur (kw)<\/td><td>2 \u00d7 2.2, 50HZ \/ 60HZ<\/td><\/tr><tr><td colspan=\"2\">Torc Brake (Km)<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Amrediad addasiad ongl rhaff ddur (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Pellter rhwng dwy rhaff ddur (mm)<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Darn wedi&#039;i osod o ddarn blaen (mm)<\/td><td>1500<\/td><\/tr><tr><td rowspan=\"5\">Platfform Atal<\/td><td>Cloi<\/td><td>Aloi alwminiwm<\/td><\/tr><tr><td>Nr.Or rac platfform<\/td><td>Rac sengl<\/td><\/tr><tr><td>Nr.Of platform<\/td><td>3<\/td><\/tr><tr><td>L \u00d7 W \u00d7 H (mm)<\/td><td>(2500 \u00d7 3) \u00d7 690 \u00d7 1180<\/td><\/tr><tr><td>Pwysau (kg)<\/td><td>455&nbsp;Kg<\/td><\/tr><tr><td colspan=\"2\">Mecanwaith atal (kg)<\/td><td>2 \u00d7 175 Kg<\/td><\/tr><tr><td colspan=\"2\">Gwrth-bwysau (kg) dewisol<\/td><td>25 \u00d7 44pcs<\/td><\/tr><tr><td colspan=\"2\">Diamedr y rhaff dur (mm)<\/td><td>8.6<\/td><\/tr><tr><td colspan=\"2\">Uchder codi uchder (m)<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Cyflymder cylchdroi modur (r \/ min)<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Voltedd (v) 3 PHASAU \/ CYFAR UNIG<\/td><td>220V \/ 380V \/ 415V, 50 \/ 60Hz (wedi&#039;i addasu)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pecynnu:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"960\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/QQ\u56fe\u724720180205093015.jpg\" alt=\"300m Rope Suspended Platform for Facade Painting - image 3\" class=\"wp-image-244\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/QQ\u56fe\u724720180205093015.jpg 720w, https:\/\/www.sewbc.com\/wp-content\/uploads\/QQ\u56fe\u724720180205093015-225x300.jpg 225w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"960\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/QQ\u56fe\u724720180205093043.jpg\" alt=\"300m Rope Suspended Platform for Facade Painting - image 4\" class=\"wp-image-245\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/QQ\u56fe\u724720180205093043.jpg 720w, https:\/\/www.sewbc.com\/wp-content\/uploads\/QQ\u56fe\u724720180205093043-225x300.jpg 225w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Manteision cystadleuol:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Sicrhau diogelwch bywyd yn gyfan gwbl yn ystod yr awyr<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mae cloi diogelwch yn cau&#039;r rhaff dur yn syth unwaith y bydd y llwyfan ar y llwyfan wedi&#039;i atal neu y rhaff dur yn llithro allan o&#039;r codiad; Cynllun rheoli trydan wedi&#039;i ddylunio gyda gwarchod rhag gollwng, gwarchod rhag gwres, amddiffyn gorlwythiad presennol a stopio br\u00eac;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rhaff gwifren dur o ansawdd da, rhaff diogelwch a chebl.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Perfformiad sefydlog: codi a gostwng yn esmwyth<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Dylunio modiwlaidd. Hawdd i&#039;w dadelfennu, cydosod gweithredu a chynnal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Gellir addasu uchder codi yn \u014dl y gofyniad (Uchafswm 300 Metr)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Gellir addasu foltedd ac amlder gweithio (220V \/ 380V \/ 415V ac ati)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">6. Gellir addasu llwyfan wedi&#039;i atal ar gyfer defnydd arbennig (cylchlythyr, si\u00e2p L, si\u00e2p U, ac ati)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">7. Ansawdd proffesiynol, pris cystadleuol, cyflenwi cyflym, gwasanaethau da.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/cy\/llwyfan-crog-lwyfan\/\">llwyfan wedi&#039;i atal dros dro<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/cy\/categori\/cynhyrchion\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/cy\/cysylltwch-a-ni\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>300m Rope Suspended Platform for Facade Painting. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":243,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,4],"tags":[13,10,14,16,15],"class_list":["post-204","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-rope-suspended-platform-manufacturer","tag-rope-suspended-platform-safety","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-suspended-wire-rope-platform","tag-temporary-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/comments?post=204"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/204\/revisions"}],"predecessor-version":[{"id":1414,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/posts\/204\/revisions\/1414"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/media\/243"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/media?parent=204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/categories?post=204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/cy\/wp-json\/wp\/v2\/tags?post=204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}