Mast Climbing and Mobile Elevated Work Platform
Mast Climbing and Mobile Elevated Work Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The final platform length, rated load, electrical supply and suspension arrangement should be confirmed for the actual project.

Llwyfan Gweithio Dros Dro Dringo Drws / llwyfan gwaith symudol uchel
Disgrifiadau
Ceisiadau:
1. Glanhau a chynnal wal allanol adeilad uchel.
2. Peintio, addurno ac ailwampio waliau allanol.
3. Prosiectau gosod a gwaith adeiladu eraill o waliau allanol adeilad uchel.
4. Gweithio awyr o long, twr mawr, pont, argaeau a simneiau mawr.
5. Gosod a chynnal a chadw ar gyfer codi lifft adeilad uchel, diwydiant adeiladu llongau, cwch ymosod, cynnal weldio rhyfeloedd.
Paramedrau Technegol
| Model Eiddo Rhif | ZLP500 | |
| Llwyth wedi'i raddio (kg) | 500 | |
| Cyflymder codi (m / min) | 9 ~ 11 | |
| Pŵer modur (kw) | 2 × 1.5 50HZ / 60HZ | |
| Torc Brake (Km) | 16 | |
| Amrediad addasiad ongl rhaff ddur (°) | 3 ° - 8 ° | |
| Pellter rhwng dwy rhaff ddur (mm) | ≤100 | |
| Darn wedi'i osod o ddarn blaen (mm) | 1500 | |
| Llwyfan tanio | Cloi | Aloi alwminiwm |
| Nr.Or rac platfform | Rac sengl | |
| Nr.Of platform | 2 | |
| L × W × H (mm) | (2500 × 2) × 690 × 1300 | |
| Pwysau (kg) | 375 Kg | |
| Mecanwaith atal (kg) | 2 × 175 Kg | |
| Gwrth-bwysau (kg) dewisol | 25 × 30pcs | |
| Diamedr y rhaff dur (mm) | 8.3 | |
| Uchder codi uchder (m) | 300 | |
| Cyflymder cylchdroi modur (r / min) | 1420 | |
| Voltedd (v) 3PHASES / Cyfnod Sengl | 220V / 380V / 415V, 50 / 60Hz (wedi'i addasu) | |
Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our llwyfan gweithio gwaharddedig, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.