Aluminum 1000 Kg Window Cleaning Platform

Aluminum 1000 Kg Window Cleaning Platform

Aluminum 1000 Kg Window Cleaning Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references 1000 kg, 2.2 kw. These values should be confirmed against the final supplied configuration and destination power supply.

Glanhau Ffenestri Rope Wedi'i Atal Platfform ZLP630 Gyda Hoist LTD6.3 Motor Power 1.5kw

Systemau Scaffaldiau a Atalwyd Alloy Alwminiwm 1000 kg 2.2 kw Ar gyfer Glanhau Ffenestri

Disgrifiadau:

Shandong SUCCESS Building Machinery Equipment Co., Ltd. is founded in 2005. It is a leading high-tech

enterprisepecialized mewn ymchwil, datblygu a gwneuthurwr Platfform Ataliedig Trydanol, Adeilad Deunydd Adeiladu, Adeiladydd Adeiladwr, Tower Crane, Hunan-symudol Jack Gantry Lifft, yn ogystal â

gwahanol fathau eraill o offer adeiladu. Rydym wedi ein lleoli yn Shandong Gaotang sir Tsieina hynny yw

cartref enedigol o beintio a chigigraffeg.

Ceisiadau o blatfform wedi ei atal:


1. Glanhau a chynnal wal allanol adeilad uchel.

2. Peintio, addurno ac ailwampio waliau allanol.

3. Prosiectau gosod a gwaith adeiladu eraill o waliau allanol adeilad uchel.

4. Gweithio awyr o long, twr mawr, pont, argaeau a simneiau mawr.

5. Gosod a chynnal a chadw ar gyfer codi lifft adeilad uchel, diwydiant adeiladu llongau, cwch ymosod, cynnal weldio rhyfeloedd.

Paramedrau Technegol


Model RhifZLP1000
Llwyth wedi'i raddio (kg)1000
Cyflymder codi (m / min)8 ~ 10
Pŵer modur (kw)2 × 2.2, 50HZ / 60HZ
Torc Brake (Km)16
Amrediad addasiad ongl rhaff ddur (°)3 ° - 8 °
Pellter rhwng dwy rhaff ddur (mm)≤100
Darn wedi'i osod o ddarn blaen (mm)1500
Platfform AtalCloiAloi alwminiwm
Nr.Or rac platfformRac sengl
Nr.Of platform3
L × W × H (mm)(2500 × 3) × 690 × 1180
Pwysau (kg)455 Kg
Mecanwaith atal (kg)2 × 175 Kg
Gwrth-bwysau (kg) dewisol25 × 44pcs
Diamedr y rhaff dur (mm)8.6
Uchder codi uchder (m)300
Cyflymder cylchdroi modur (r / min)1420
Voltedd (v) 3 PHASAU220V / 380V / 415V (wedi'i addasu)

Prosiectau:


Aluminum 1000 Kg Window Cleaning Platform - image 2

Configuration and Applications

Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.

Project Information Required

  • Building height and required working length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Review our llwyfannau mynediad wedi'u hatal, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.