Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

Platfform dur ZLP800 wedi'i atal i lanhau waliau allanol
Mae Platfform Ataliedig Dur ZLP800 yn cynnwys y cydrannau gan: hylifau, cloeon diogelwch, system rheoli trydan, llwyfan atal, mecanwaith atal, gwrthbwyso, rhaff dur, ac ati. Ac, Fe'i defnyddir yn bennaf wrth ailwampio'r wal allan, Gosod wal llen a glanhau ffenestri.
1. Y paramedrau technegol
| Model | ZLP800 | |
| Hyd rhaff gwifren / Dur gwifren | 100 metr | |
| Llwyth wedi'i osod | 800Kgs | |
| Cyflymder codi | 9.6M / Min | |
| Mesuriadau llwyfan (L * W * H) | 7500MM * 690MM * 1300MM | |
| Diamedr rhaffau dur | 9.1MM | |
| Arholiad | Pŵer | 2 * 1.8Kw |
| foltedd | 380V, 50HZ, 3 Phas | |
| Diogelwch diogelwch | Y llu effaith fwyaf | 30KN |
| Anglwm cebl locio | 3º-8º | |
| Mecanwaith atal | Overhang trawst blaen | 1.3-1.7M |
| Cefnogaeth uchder addasadwy | 1.44-2.14M | |
| Olwyn isaf | 4 Pcs | |
| Pwysau gwrthcrid concrete | 1000Kg | |
| Llwybr caster dan lwyfan | 4 Pcs | |
2 Darlunio Cynnyrch

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our llwyfan glanhau ffenestri, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
