Hot-galvanized ZLP500 Suspended Working Platform
Hot-galvanized ZLP500 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp500, 2M, 1.5KW. These values should be confirmed against the final supplied configuration and destination power supply.

2M * 2, 1.5KW Dur / Galwynedig Poeth / Alwminiwm Alloy Rope Wedi'i Atal Platform ZLP500
Ein ffatri:
Shanghai Success International Trading Co, Ltd wedi'i sefydlu yn 2008. Mae'n fenter uwch-dechnoleg blaenllaw sy'n arbenigo mewn ymchwil, datblygu a gwneuthurwr trydanol wedi'i atal
Llwyfan, codi arian a gwahanol fathau eraill o offer adeiladu. Mae ein cynnyrch gydag ansawdd proffesiynol, pris cystadleuol a chyflenwi cyflym. Gallwn ni eu haddasu yn ôl eich gofynion.

Ceisiadau:
1.Cleanio a chynnal wal allanol adeilad uchel.
2. Paentio, addurno ac ailwampio waliau allanol.
3. Prosiectau gosod a gwaith adeiladu eraill o waliau allanol adeilad uchel.
4. Gweithio awyr o long, twr mawr, pont, argaeau a simneiau mawr.
5. Gosod a chynnal a chadw ar gyfer codi lifft adeilad uchel, diwydiant adeiladu llongau, cwch ymosod, cynnal weldio rhyfeloedd.
Manylebau:
| Model Eiddo Rhif | ZLP500 | |
| Llwyth wedi'i raddio (kg) | 500 | |
| Cyflymder codi (m / min) | 9 ~ 11 | |
| Pŵer modur (kw) | 2 × 1.5 50HZ / 60HZ | |
| Torc Brake (Km) | 16 | |
| Amrediad addasiad ongl rhaff ddur (°) | 3 ° - 8 ° | |
| Pellter rhwng dwy rhaff ddur (mm) | ≤100 | |
| Darn wedi'i osod o ddarn blaen (mm) | 1500 | |
| Llwyfan tanio | Cloi | Aloi alwminiwm |
| Nr.Or rac platfform | Rac sengl | |
| Nr.Of platform | 2 | |
| L × W × H (mm) | (2000 × 2) × 690 × 1180 | |
| Pwysau (kg) | 375 Kg | |
| Mecanwaith atal (kg) | 2 × 175 Kg | |
| Gwrth-bwysau (kg) dewisol | 25 × 30pcs | |
| Diamedr y rhaff dur (mm) | 8.3 | |
| Uchder codi uchder (m) | 300 | |
| Cyflymder cylchdroi modur (r / min) | 1420 | |
| Voltedd (v) 3 PHASAU | 220V / 380V / 415V (wedi'i addasu) | |
Prif Gyfansoddion:




Pecynnu:


Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our llwyfan wedi'i atal dros dro, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.
