Mast Climbing and Mobile Elevated Work Platform

Mast Climbing and Mobile Elevated Work Platform

Mast Climbing and Mobile Elevated Work Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The final platform length, rated load, electrical supply and suspension arrangement should be confirmed for the actual project.

Llwyfan Gweithio Dros Dro Dringo Drws / llwyfan gwaith symudol uchel

Llwyfan Gweithio Dros Dro Dringo Drws / llwyfan gwaith symudol uchel

Disgrifiadau


Ceisiadau:

1. Glanhau a chynnal wal allanol adeilad uchel.

2. Peintio, addurno ac ailwampio waliau allanol.

3. Prosiectau gosod a gwaith adeiladu eraill o waliau allanol adeilad uchel.

4. Gweithio awyr o long, twr mawr, pont, argaeau a simneiau mawr.

5. Gosod a chynnal a chadw ar gyfer codi lifft adeilad uchel, diwydiant adeiladu llongau, cwch ymosod, cynnal weldio rhyfeloedd.

Paramedrau Technegol


Model Eiddo RhifZLP500
Llwyth wedi'i raddio (kg)500
Cyflymder codi (m / min)9 ~ 11
Pŵer modur (kw)2 × 1.5 50HZ / 60HZ
Torc Brake (Km)16
Amrediad addasiad ongl rhaff ddur (°)3 ° - 8 °
Pellter rhwng dwy rhaff ddur (mm)≤100
Darn wedi'i osod o ddarn blaen (mm)1500
Llwyfan tanioCloiAloi alwminiwm
Nr.Or rac platfformRac sengl
Nr.Of platform2
L × W × H (mm)(2500 × 2) × 690 × 1300
Pwysau (kg)375 Kg
Mecanwaith atal (kg)2 × 175 Kg
Gwrth-bwysau (kg) dewisol25 × 30pcs
Diamedr y rhaff dur (mm)8.3
Uchder codi uchder (m)300
Cyflymder cylchdroi modur (r / min)1420
Voltedd (v) 3PHASES / Cyfnod Sengl220V / 380V / 415V, 50 / 60Hz

(wedi'i addasu)

Configuration and Applications

Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.

Project Information Required

  • Building height and required working length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Review our llwyfan gweithio gwaharddedig, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.