Hot-galvanized 415V Rope Suspended Platform

Hot-galvanized 415V Rope Suspended Platform

Hot-galvanized 415V Rope Suspended Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references ZLP800, ZLP630, 6M, 415v, 50hz. These values should be confirmed against the final supplied configuration and destination power supply.

Llwyfan Galosgedig / Alwminiwm Poeth wedi'i Atal Platfform 415v 50hz Modur Dau1.8kw

415V / 50HZ 3 Cyfnod ZLP800 Platform Galwedig / Alwminiwm Sych wedi'i Rwystro'n Gallanedig


Cais Platfform Gosodiedig ZLP800
1. Adeiladu Gwaith Adeiladu
2. Adeiladu Ffasadau Glanhau
3. Gwaith Peintio Adeiladu
Plastr 4.Wall, Pwt Wal a Gwead
5.Cynllunio / Adfer Dams
Gwaith Tŵr 6.Cooling
7.Cysylltu a Chynnal a Chadw Plant Silo Cement
8.Cofal a Chynnal Ciniawau
9. Gweithio ar Melin Gwynt

Data Technegol ar gyfer Platfform ZPP800 wedi'i atal dros dro


Model Eiddo Rhif
ZLP630-6M
ZLP800-7.5M
ZLP1000-7.5M
Llwyth wedi'i raddio (kg)
630
800
1000
Cyflymder codi (m / min)
9 ~ 11
8 ~ 10
8~10
Pŵer modur (kw)
2 × 1.5 50HZ / 60HZ
2 × 1.8 50HZ / 60HZ
2 × 2.2 50HZ / 60HZ
Torc Brake (Km)
16
16
16
Amrediad addasiad ongl rhaff ddur (°)
3 ° - 8 °
3 ° - 8 °
3 ° - 8 °
Darn wedi'i osod o ddarn blaen (mm)
1500
1500
1500
Diamedr y rhaff dur (mm)
8.3
8.6
9.1
Uchder codi uchder (m)
300
300
300
Cyflymder cylchdroi modur (r / min)
1420
1420
1420
Voltage (v) / 3PHASES
220V / 380V / 415V / 440V
220V / 380V / 415V / 440V
220V / 380V / 415V / 440V
Lock Diogelwch
2 PCS o LDF30
220V / 380V / 415V / 440V
220V / 380V / 415V / 440V
Remark:special sizes can be supplied as per the buyer’s request.
Hot-galvanized 415V Rope Suspended Platform - image 2
Hot-galvanized 415V Rope Suspended Platform - image 3

Configuration and Applications

Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.

Project Information Required

  • Building height and required working length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Review our llwyfan gweithio gwaharddedig, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.