{"id":228,"date":"2018-09-29T08:16:28","date_gmt":"2018-09-29T08:16:28","guid":{"rendered":"https:\/\/www.sewbc.com\/?p=228"},"modified":"2026-06-23T01:53:55","modified_gmt":"2026-06-23T01:53:55","slug":"1000-kg-7-5-mx-3-sections-aluminum-alloy-suspended-working-platform-zlp1000","status":"publish","type":"post","link":"https:\/\/www.sewbc.com\/ceb\/1000-kg-7-5-m-x-3-sections-aluminum-alloy-suspended-working-platform-zlp1000.html","title":{"rendered":"Aluminum 7.5 M ZLP1000 Suspended Working Platform"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Aluminum 7.5 M ZLP1000 Suspended Working Platform<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Aluminum 7.5 M ZLP1000 Suspended Working Platform<\/strong> is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp1000, 1000 kg, 7.5 m. These values should be confirmed against the final supplied configuration and destination power supply.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"452\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/1000-kg-7.5-m-x-3-Sections-Aluminum-Alloy-Suspended-Working-Platform-ZLP1000.jpg\" alt=\"1000 kg 7.5 mx 3 Mga Seksyon Aluminyo Alloy Gisuspinde nga Nagtrabaho nga Plataporma ZLP1000\" class=\"wp-image-229\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/1000-kg-7.5-m-x-3-Sections-Aluminum-Alloy-Suspended-Working-Platform-ZLP1000.jpg 600w, https:\/\/www.sewbc.com\/wp-content\/uploads\/1000-kg-7.5-m-x-3-Sections-Aluminum-Alloy-Suspended-Working-Platform-ZLP1000-300x226.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1000 kg 7.5 mx 3 Mga Seksyon Aluminyo Alloy Gisuspinde nga Nagtrabaho nga Plataporma ZLP1000<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Mga paghulagway<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">Mga aplikasyon:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1. Paglimpyo ug pagmentinar sa gawas sa bongbong sa taas nga building.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2. Pagdibuho, dekorasyon ug pag-ayo sa mga bungbong sa gawas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3. Mga proyekto sa pag-instalar ug uban pang pagtukod nga pagtrabaho sa mga pang-gawas nga mga bungbong sa taas nga building.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4. Aerial nga pagtrabaho sa barko, dako nga tore, tulay, dam ug dagkong mga panghaw.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5. Pag-instalar ug pagmentinar sa high-rise building elevator hoistway, industriya sa paghimo sa barko, barko sa sakayan,<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">pagmintinar sa mga barko-de-gera.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Teknikal nga Parameter<\/h3>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td colspan=\"2\">Modelong Kabag-ohan.<\/td><td>ZLP1000<\/td><\/tr><tr><td colspan=\"2\">Rated nga load (kg)<\/td><td>1000<\/td><\/tr><tr><td colspan=\"2\">Pagbayaw speed (m \/ min)<\/td><td>8 ~ 10<\/td><\/tr><tr><td colspan=\"2\">Ang gahum sa motor (kw)<\/td><td>2 \u00d7 2.2 50HZ \/ 60HZ<\/td><\/tr><tr><td colspan=\"2\">Brake torque (Km)<\/td><td>16<\/td><\/tr><tr><td colspan=\"2\">Steel rope angle adjusting range (\u00b0)<\/td><td>3 \u00b0 - 8 \u00b0<\/td><\/tr><tr><td colspan=\"2\">Ang gilay-on tali sa duha ka pisi nga bakal (mm)<\/td><td>\u2264100<\/td><\/tr><tr><td colspan=\"2\">Gikutgo nga hugpong sa atubangan nga poste (mm)<\/td><td>1500<\/td><\/tr><tr><td rowspan=\"5\">Nagpalayo nga plataporma<\/td><td>Pagtipig<\/td><td>Aluminum alloy<\/td><\/tr><tr><td>Dili. Sa plataporma<\/td><td>Single rack<\/td><\/tr><tr><td>Dili. Sa plataporma<\/td><td>3<\/td><\/tr><tr><td>L \u00d7 W \u00d7 H (mm)<\/td><td>(2500 \u00d7 3) \u00d7 690 \u00d7 1300<\/td><\/tr><tr><td>Timbang (kg)<\/td><td>455 Kg<\/td><\/tr><tr><td colspan=\"2\">Pagdugtong nga mekanismo (kg)<\/td><td>2 \u00d7 175 Kg<\/td><\/tr><tr><td colspan=\"2\">Ang timbang (kg) nga opsyonal<\/td><td>25 \u00d7 44pcs<\/td><\/tr><tr><td colspan=\"2\">Diametro sa pisi nga bakal (mm)<\/td><td>8.6 \/ 9.1<\/td><\/tr><tr><td colspan=\"2\">Pagtaas sa Max (m)<\/td><td>300<\/td><\/tr><tr><td colspan=\"2\">Gilis sa rotasyon sa motor (r \/ min)<\/td><td>1420<\/td><\/tr><tr><td colspan=\"2\">Boltahe (v) 3PHASES<\/td><td>220V \/ 380V \/<p><\/p>\n<p>415V<\/p><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"680\" height=\"320\" src=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Main-Parts-1.jpg\" alt=\"Aluminum 7.5 M ZLP1000 Suspended Working Platform - image 2\" class=\"wp-image-230\" srcset=\"https:\/\/www.sewbc.com\/wp-content\/uploads\/Main-Parts-1.jpg 680w, https:\/\/www.sewbc.com\/wp-content\/uploads\/Main-Parts-1-300x141.jpg 300w\" sizes=\"auto, (max-width: 680px) 100vw, 680px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Detalyadong Deskripsyon sa Produkto<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Material: Aluminum Alloy<br>\nKolor: Pilak<br>\nBoltahe: 380V \/ 415V \/ 440V \/ 220V, 50 \/ 60Hz (mahimo nga Customized)<br>\nHoist Power: 2.2kw<br>\nPagtaas sa Gitas-on: 300 Mts (Max.)<br>\nDiameter Sa Steel Rope: 9.1mm<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Configuration and Applications<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Information Required<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building height and required working length<\/li>\n\n\n\n<li>Workers, tools and material load<\/li>\n\n\n\n<li>Voltage, phase and frequency<\/li>\n\n\n\n<li>Roof parapet, suspension beam and counterweight conditions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Review our <a href=\"https:\/\/www.sewbc.com\/ceb\/gisuspinde-nagtrabaho-plataporma\/\">gisuspinde nga nagtrabaho plataporma<\/a>, browse the <a href=\"https:\/\/www.sewbc.com\/ceb\/kategoriya\/mga-produkto\/\">product article library<\/a>, or <a href=\"https:\/\/www.sewbc.com\/ceb\/kontak-kanato\/\">send the project requirements<\/a> to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Aluminum 7.5 M ZLP1000 Suspended Working Platform. Review specifications, applications, configuration options and project information required before ordering<\/p>","protected":false},"author":1,"featured_media":229,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,3],"tags":[10,14,15],"class_list":["post-228","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-suspended-working-platform-manufacturer","tag-suspended-platform-hoist","tag-suspended-scaffold-platform","tag-temporary-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/posts\/228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/comments?post=228"}],"version-history":[{"count":3,"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/posts\/228\/revisions"}],"predecessor-version":[{"id":1417,"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/posts\/228\/revisions\/1417"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/media\/229"}],"wp:attachment":[{"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/media?parent=228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/categories?post=228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sewbc.com\/ceb\/wp-json\/wp\/v2\/tags?post=228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}