Steel Three-phase ZLP800 Suspended Working Platform
Steel Three-phase ZLP800 Suspended Working Platform is a temporary access configuration for facade construction, cleaning, painting or maintenance where a roof-suspended system is appropriate. The existing specification references zlp800, 100 Meters, 9.6M, 380v. These values should be confirmed against the final supplied configuration and destination power supply.

Ang ZLP800 steel gisuspinde nga plataporma alang sa panglimpyo sa gawas sa koral
Ang ZLP800 Steel Suspended Platform naglangkob sa mga sangkap sa: hoists, safety locks, electric control system, pagsuspende sa plataporma, mekanismo sa pagsuspinde, counter weight, steel rope, etc, ug, kini gigamit sa pag-ayo sa out wall, pag-instalar sa curtain wall ug paghinlo sa bintana.
1. Ang teknisyal nga mga sumbanan
| Modelo | ZLP800 | |
| Cable / Steel wire rope length | 100 ka metros | |
| Rated nga load | 800Kgs | |
| Pagtaas sa gikusgon | 9.6M / Min | |
| Mga sukat sa plataporma (L * W * H) | 7500MM * 690MM * 1300MM | |
| Ang steel rope diametro | 9.1MM | |
| Hoist | Gahum | 2 * 1.8Kw |
| Boltahe | 380V, 50HZ, 3 Phases | |
| Lock sa safety | Maximum nga puwersa sa epekto | 30KN |
| Pag-lock sa anggulo sa kable | 3º-8º | |
| Mekanismo sa pagsuspinde | Ang front beam overhang | 1.3-1.7M |
| Pagsuporta sa tukma nga gitas-on | 1.44-2.14M | |
| Ubos nga ligid | 4 ka mga Pcs | |
| Concrete counter weight | 1000Kg | |
| Ang ligid sa Caster ubos sa plataporma | 4 ka mga Pcs | |
2 Product Drawing

Configuration and Applications
Model selection should consider the complete working load, platform section arrangement, building height, facade geometry and operating environment. A higher model rating does not allow the platform length or carried load to exceed the approved system limits.
Project Information Required
- Building height and required working length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Review our pagpanghinlo sa bintana, browse the product article library, or send the project requirements to Shanghai Success Construction International Trade Co., Ltd. Site planning should follow applicable local regulations and the OSHA suspended scaffold requirements.